Nantenbach Curve

Nantenbach curve
Nantenbacher Kurve.png
Overview
Native name Nantenbacher Kurve or Verbindungskurve Nantenbach
Locale Bavaria
Line number 5216
Technical
Line length 11.3 km (7.0 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius 2.650 m
Electrification 15 kV/16.7 Hz AC overhead catenary
Operating speed 200 km/h (124.3 mph) (maximum)
Route map
 Operating points and lines 
Main–Spessart line from Aschaffenburg
0.0 Abzweig Nantenbach junction
Main–Spessart line to Gemünden (Main)
Main Viaduct, Nantenbach(694.5 m)
1.6 Schönrain Tunnel(3,941 m)
5.8 Harrbach Tunnel(526 m)
6.6 Ständelberg Tunnel(618 m)
7.5 Rammersberg Tunnel(1,361 m)
HSL(295 m) over track to Würzburg only
Hannover–Würzburg HSL
10.7
301.9
Km change
302.5 Rohrbach operating station
to Würzburg Hbf

The Nantenbach Curve (German: Nantenbacher Kurve or Verbindungskurve Nantenbach) is the name of a connecting curve between the Main-Spessart Railway and the Hanover–Würzburg high-speed line. Coming from Aschaffenburg the line branches off towards Würzburg, about five kilometres northeast of Lohr, in the cadastral district of Nantenbach, in the community of Neuendorf. From the Main-Spessart line, the railway turns in a wide curve to the southeast to a junction at the Rohrbach operating station on the Hanover–Würzburg line.

The route is 11.3 kilometres long with continuous double track, electrified, equipped with the German train protection system, Linienzugbeeinflussung and running on many engineering structures: the 694.5 metre long viaduct over the Main, followed by the 3,941 m long Schönrain Tunnel (passing under the 5,528 m long Muhlberg Tunnel on the Hanover–Würzburg line) and another three tunnels. About 60 percent of the curve (6,449 m) is four tunnels with lengths between 526 and 3941 metres. The track rises 127 m from the Nantenbach junction at 156 m above sea level to Rohrbach operating station at 283 meters above sea level on a consistent grade of 1.25%. The minimum curve radius of 2,650 m allows a speed of 200 km/h. 740 m of the line is on bridges. The track is located for its full length in the Main-Spessart nature park. The track is built largely slab track on an asphalt base.

The line is used by about 60 freight and passenger trains each day.

Planning for the line started in 1975 and planning approval was given in 1988. Construction started in March 1990 and the line was put into operation in June 1994.


...