*** Welcome to piglix ***

Hanover–Würzburg high-speed railway

Hanover–Würzburg high-speed railway
SFS Hannover-Wuerzburg.png
Overview
Native name Schnellfahrstrecke Hannover–Würzburg
Line number 1733
Technical
Line length 327 km (203 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius 5,100 m (16,700 ft)
Electrification 15 kV/16.7 Hz AC overhead catenary
Operating speed 280 km/h (170 mph) (maximum)
Maximum incline 1.25%
Route number 351

Source: German railway atlas

The Hanover–Würzburg high-speed railway was the first of several high-speed railway lines for InterCityExpress traffic that were built in Germany. While technically starting in the village of Rethen and ending several kilometres north of Würzburg Hauptbahnhof, it is a de facto link between Hanover and Würzburg, with stops at Göttingen, Kassel and Fulda. Early construction started in 1973, the line opening fully in 1991.

At 327 km (203 mi) in length, it is the longest newly built rail line in Germany, and its construction costs are estimated to be about DM 40 million (€ 20.45 million) per kilometre.

The Deutsche Bundesbahn began construction of the line in 1973. Since it was designed for fast passenger trains as well as for express freight trains, its maximum incline is a mere 1.25%. Combined with the hilly terrain, this made the construction of 61 tunnels and 10 large bridges necessary. Of the 327 km of total length, 120 km are in tunnels, the two longest being the Landrücken Tunnel (10,779 m) south of Fulda, the second longest being the Mündener Tunnel (10,525 m) south of Hann. Münden. The highest bridge is the Rombach Valley Bridge near Schlitz at 95 metres.

Notwithstanding 10,700 complaints and 360 lawsuits, the line was opened fully in 1991, though the WürzburgFulda part was used by InterCity trains as early as 1988. The standard speed on the line is 250 km/h (155 mph); 280 km/h may be reached by trains running late.


...