Murum Dam

Murum Dam
Murum Dam view from afar.jpg
Murum Dam is located in Malaysia
Murum Dam
Location of Murum Dam in Malaysia
Country Malaysia
Location Belaga, Sarawak, Borneo
Coordinates 2°38′48″N 114°21′57″E / 2.64667°N 114.36583°E / 2.64667; 114.36583Coordinates: 2°38′48″N 114°21′57″E / 2.64667°N 114.36583°E / 2.64667; 114.36583
Status Operational
Construction began 2008
Opening date 2014
Construction cost MYR 4.1 billion
Owner(s) Sarawak Energy Berhad
Dam and spillways
Type of dam Gravity, roller-compacted concrete
Impounds Murum River
Height 141 m (463 ft)
Length 473 m (1,552 ft)
Reservoir
Total capacity 12,043,000,000 m3 (9,763,419 acre·ft)
Active capacity 5,475,000,000 m3 (4,438,655 acre·ft)
Inactive capacity 6,568,000,000 m3 (5,324,764 acre·ft)
Catchment area 2,750 km2 (1,062 sq mi)
Surface area 245 km2 (95 sq mi)
Normal elevation 540 m (1,772 ft)
Power station
Name Muram Hydroelectric Power Station
Coordinates 2°40′14.94″N 114°17′41.14″E / 2.6708167°N 114.2947611°E / 2.6708167; 114.2947611
Commission date 2014-2015
Turbines 4 x 236 MW Francis-type
Installed capacity 944 MW

The Murum Dam is a gravity dam on the Murum River in Sarawak, Malaysia. Construction began in 2008. The dam's reservoir began to fill in July 2013 and the first generator was commissioned in December 2014. The fourth and final turbine began operations on 8 June 2015. Concerns have been raised about the displacement of the Dayak people and the removal of rainforest due to the construction of the dam.

The dam site is located on the Murum River, which is in the uppermost part of the Rajang River basin, 200 km (124 mi) from Bintulu. The upstream of Rajang river includes four steps, which are Pelagus, Bakun, Murum, and Belaga. The Murum Hydroelectric Project is the second Step-Hydroelectric Project of the four steps, and is 70 km (43 mi) from the constructing Bakun Hydroelectric Project downstream.


...