Murray 1 | |
---|---|
The machine hall floor of Murray 1 Power Station
|
|
Official name | Murray One Hydroelectric Power Station |
Country | Australia |
Location | Snowy Mountains, New South Wales |
Coordinates | 36°14′49″S 148°11′25″E / 36.24694°S 148.19028°E |
Status | Operational |
Commission date | 1967 |
Owner(s) | Snowy Hydro |
Pumped-storage power station | |
Upper reservoir | Geehi Reservoir |
Upper res. capacity | 21,093 ML (744.9×10 6 cu ft) |
Lower reservoir | Murray 2 Pondage |
Lower res. capacity | 2,344 ML (82.8×10 6 cu ft) |
Hydraulic head | 460.2 m (1,510 ft) |
Pump-generators | 10 |
Power generation | |
Make and model | Boving Engineering UK |
Nameplate capacity | 950 MW (1,270,000 hp) |
Annual gross output | 1,413 GWh (5,090 TJ) |
Murray 2 | |
---|---|
Official name | Murray Two Hydroelectric Power Station |
Country | Australia |
Location | Snowy Mountains, New South Wales |
Coordinates | 36°14′33″S 148°08′11″E / 36.24250°S 148.13639°E |
Status | Operational |
Commission date | 1969 |
Owner(s) | Snowy Hydro |
Pumped-storage power station | |
Upper reservoir | Murray 2 Pondage |
Lower reservoir | Khancoban Reservoir |
Lower res. capacity | 26,643 ML (940.9×10 6 cu ft) |
Hydraulic head | 264.3 m (867 ft) |
Power generation | |
Nameplate capacity | 550 MW (740,000 hp) |
Annual gross output | 810 GWh (2,900 TJ) |
The Murray Region Hydroelectric Power Stations refers to two of seven hydroelectric power stations, both located near the town of Khancoban in the Snowy Mountains region of New South Wales, Australia. The two power stations are part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro. Although both power stations are physically located in New South Wales, since 1 July 2008 all power generated has been allocated to the Victorian region of the National Electricity Market. The stations are not located on the Murray River.
Murray 1 Power Station is located 10 kilometres (6.2 mi) north of Khancoban along the Alpine Way. The conventional gravity-fed hydroelectric power station has ten, vertical Francis, Boving Engineering UK-manufactured turbines, each fitted with ASEA-manufactured generators, with a combined generating capacity of 950 megawatts (1,270,000 hp) of electricity. The power station was completed in 1967, and has 460.2 metres (1,510 ft) rated head. Fed by natural inflow, supplemented by the pumped flows of the Snowy-Geehi Haupt-tunnel from Island Bend Pondage, it receives water from the Geehi Reservoir on the Geehi River and discharges into the Murray 2 Pondage. The station is capable of producing enough electricity to supply over 95,000 homes.