Mavis Road | |||||||
---|---|---|---|---|---|---|---|
Peel Regional Road 18 | |||||||
![]() Mavis Rd. within Mississauga
|
|||||||
Route information | |||||||
Maintained by City of Mississauga (south of Hwy. 407) Region of Peel (north of Hwy. 407) |
|||||||
Length: | 15 km (9 mi) | ||||||
Major junctions | |||||||
South end: |
![]() |
||||||
Dundas Street Burnhamthorpe Road ![]() Eglinton Avenue ![]() ![]() ![]() ![]() |
|||||||
North end: |
![]() |
||||||
Highway system | |||||||
|
Chinguacousy Road | |||||||
---|---|---|---|---|---|---|---|
Route information | |||||||
Maintained by City of Brampton Town of Caledon |
|||||||
Length: | 22 km (14 mi) | ||||||
Major junctions | |||||||
South end: |
![]() |
||||||
![]() Williams Parkway ![]() Sandalwood Parkway ![]() ![]() |
|||||||
North end: | Dead ends north of ![]() |
||||||
Highway system | |||||||
|
Mavis Road and Chinguacousy Road are a pair of interlined roads in Peel Region, Ontario, Canada, running in the cities of Mississauga, Brampton, and the Town of Caledon. Their combined lengths are approximately 37 kilometres (23 miles).
Mavis Road begins at the Queensway, as a continuation of Stavebank Road (a residential street), and runs north to Steeles Avenue, where Chinguacousy Road takes over. Between Highway 407 and Steeles Avenue, it is maintained by Peel Region and designated as Peel Regional Road 18.
Unlike most major roads in Peel, and the Greater Toronto Area in general, Mavis Road was largely built in modern times. Only the southernmost portion was part of Peel's original concession road grid, and was named Stavebank Road, parts of which still bear that name (see above). The section north of Queensway was later renamed Mavis Road and was reconstructed as a major thoroughfare when the area became more developed. It was extended north of its original terminus at Eglinton Avenue to Britannia Road. in 1991, and then extended north of Highway 401 (where a new interchange was constructed) in 1999 to its current terminus at Steeles Avenue. To connect with Chinguacousy Rd. at Steeles, the Mavis extension had to veer westwards from its main alignment and displaced Second Line West (which was subsequently either closed or broken up into various local streets) as the primary artery southwards.