Marlow Bottom | |
---|---|
Marlow Bottom |
|
Marlow Bottom shown within Buckinghamshire | |
Population | 3,295 3,438 (2011 Census) |
OS grid reference | SU845885 |
Civil parish |
|
District | |
Shire county | |
Region | |
Country | England |
Sovereign state | United Kingdom |
Post town | MARLOW |
Postcode district | SL7 |
Dialling code | 01628 |
Police | Thames Valley |
Fire | Buckinghamshire |
Ambulance | South Central |
EU Parliament | South East England |
UK Parliament | |
Marlow Bottom is a large linear village occupying a valley to the north of Marlow, Buckinghamshire. It is also a civil parish in Wycombe district having been created in November 2007. Formerly it was part of the parish of Great Marlow.
Marlow Bottom is 25 to 30 minutes walk from the centre of Marlow town, and the river Thames. It has shops, including a newsagent, vet, butcher, chemist, music shop, dog grooming parlour and a fish & chip shop, a large primary school, (Burford School), a private members club (The Barn Club, for valley residents), a village hall and two small churches (Anglican and Methodist) which form a Local Ecumenical Partnership "The Valley Church", where the local Boy Scout and Girl Guide groups and similar voluntary groups meet. Marlow Bottom is also home to the Rebellion Beer Company, an award-winning local brewery producing regular and seasonal beers. The brewery hosts open evenings coupled with a tour every first Tuesday of each month for visitors and every second Tuesday of each month for members.
The primary school in Marlow Bottom is Burford County Combined School. It provides schooling for children aged 4–11, who will go on to either a local grammar school or secondary modern school depending on their results in the eleven-plus exam.
The vast majority of students who attend Burford School live in the village although the school does accept students from outside.
At present the school accommodates more than 420 pupils. The main school building comprises classrooms, work areas, a main hall, an information and communication technology (ICT) room and administrative offices. During 2001/02 two new classrooms were built. A new building that houses the library and music rooms was completed during the summer holidays. In September a new computer network was installed in the refurbished ICT room.