Saga Pearl II in Tallinn, Estonia, on September 20th 2014, with blue funnel.
|
|
History | |
---|---|
Name: |
|
Owner: | Saga Cruises |
Operator: |
|
Port of registry: | |
Builder: | Howaldtswerke-Deutsche Werft, Werk Ross, Hamburg |
Yard number: | 165 |
Laid down: | 20 May 1980 |
Launched: | 16 December 1980 |
Completed: | December 1981 |
In service: | 14 December 1981 |
Identification: |
|
Status: | In service |
General characteristics | |
Class and type: | cruise ship |
Tonnage: | 18,591 GT → 18,627 GT |
Length: | 164.35 m (539 ft) |
Beam: | 22.6 m (74 ft) |
Draught: | 6.2 m (20 ft) |
Propulsion: |
|
Speed: |
|
Capacity: |
|
Crew: | 220 |
The cruise ship Saga Pearl II (formerly Astoria and Quest for Adventure) has been operating for more than 28 years, making cruises worldwide. Saga Cruises acquired the ship, at auction, in August 2009. Saga Pearl II effectively replaced the MS Saga Rose which was decommissioned in 2009. Both ships were formerly operated by Transocean Tours.
The ship was given the name Saga Pearl II before embarking on her first cruise for Saga in March 2010.
In May 2012, she was renamed as Quest for Adventure. In November 2013 the name reverted to Saga Pearl II. Saga currently have one other cruise ship, the MS Saga Sapphire.
The ship was built in 1981 in the ship yard of Howaldtswerke-Deutsche Werft, Werk Ross, Hamburg, Yard no. 165. The builder was one of the highest quality builders of the time. The ship was ordered by the newly formed German company Hadag Cruise Line, but was quickly sold to South African company Safmarine, because the ship was not profitable enough.
In 1985 the ship was renamed Arkona.
As Astoria the vessel operated in the Atlantic Ocean making cruises between South Africa and Europe. This continued for many years, before in 2002 it entered service for Transocean Tours, the company specialized in cruising in Norway and Europe. The vessel then operated closer to the shore, making low-cost cruises for German, Norwegian and Swedish passengers.
In November 2008, a world cruise had to be aborted after serious mechanical problems were identified during a refit in Barcelona. The ship remained laid up in Barcelona until June 2009 when she was towed to Gibraltar. After an auction in August, Saga Cruises acquired the ship after an unsuccessful attempt to do so earlier in the year.
In late 2009, the ship sailed to Swansea, Wales where she underwent a £20million three-month refit in the re-opened Swansea dry dock. She sailed on her first cruise as Saga Pearl II on 15 March 2010 to the Norwegian Fjords.