| Loop line | |||
|---|---|---|---|
| Loop | |||
| Overview | |||
| Native name | 重庆轨道交通环线 | ||
| Type | Rapid transit | ||
| System | Chongqing Rail Transit | ||
| Status | Under construction | ||
| Locale | Chongqing, China | ||
| Stations | 33 | ||
| Line number | 0 | ||
| Operation | |||
| Planned opening |
September 2018 (Northeastern Section) 2020 (Southwestern Section) |
||
| Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. | ||
| Technical | |||
| Line length | 51 km (32 mi) | ||
| Number of tracks | 2 | ||
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
| Electrification | 1500 V DC Overhead line | ||
| |||