| Line 10 | |||
|---|---|---|---|
| 10 | |||
| Overview | |||
| Native name | 重庆轨道交通10号线 | ||
| Type | Rapid transit | ||
| System | Chongqing Rail Transit | ||
| Status | Operational | ||
| Locale | Chongqing, China | ||
| Termini |
Wangjiazhuang Liyuchi |
||
| Stations | 18 | ||
| Line number | 10 | ||
| Operation | |||
| Opened | 28 December 2017 | ||
| Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. | ||
| Technical | |||
| Line length | 34 km (21 mi) | ||
| Number of tracks | 2 | ||
| Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
| Electrification | 1500 V DC Overhead line | ||
| Operating speed | 120 km/h (75 mph) (Peak) | ||
| |||