Overview
Location Through Lion Rock, connecting Kowloon Tong to Tai Wai in Hong Kong
Coordinates 22°21′21″N 114°10′22″E / 22.35583°N 114.17278°E / 22.35583; 114.17278Coordinates: 22°21′21″N 114°10′22″E / 22.35583°N 114.17278°E / 22.35583; 114.17278
Status Active
Route Route 1
Start Kowloon Tong
End Tai Wai
Operation
Work begun January 1962
Opened 14 November 1967 (1967-11-14) (Lion Rock Tunnel)
18 January 1978 (Second Lion Rock Tunnel)
Owner Hong Kong Government
Operator Greater Lucky (H.K.) Co., Ltd
Toll HK$8
Vehicles per day 90,608
Technical
Design engineer Young Au Young
Length 1.4 km
Number of lanes 2 in each direction
Operating speed 70 km/h
Chinese name
Traditional Chinese 獅子山隧道
Simplified Chinese 狮子山隧道

The Lion Rock Tunnel, the first major road tunnel in Hong Kong, is a twin-bored toll tunnel, connecting Sha Tin in the New Territories and New Kowloon near Kowloon Tong. It has two lanes in each direction, with toll booths located at the Sha Tin end. It is a vital component of Route 1.

The construction of Lion Rock Tunnel started in January 1962. The tunnel was opened on 14 November 1967, as a 1.43 km dual-one single bore tunnel. This tunnel is often described as a by-product of the Plover Cove Scheme, which was a project to build a water supply tunnel through the range of hills separating New Kowloon and the rest of the New Territories. The Tunnel was designed by Young Au Young, a civil engineer from Shunde.

The government later saw the need for another road link between New Kowloon and Sha Tin when it decided to develop the latter as a new town. The Second Lion Rock Tunnel, which is 1.41 km long and situated to the west of, and lying parallel to, the old tunnel, was opened to traffic on 18 January 1978.

The new tunnel serves northbound traffic towards Sha Tin, while the old one serves southbound traffic towards Kowloon. Traffic in both directions share one of the tunnels when the other undergoes maintenance works.

Since 1993, Serco has been contracted to manage, operate and maintain the tunnel, having successfully retained the contract in 1996 and 2000.

The Tunnel has achieved both ISO 9001 and OHASA18001 in 2004. The toll to traverse the Lion Rock Tunnel is HK$8 each way.

On 23 April 2012, Greater Lucky (H.K.) Company Limited successfully bid the contract and took over the management with effect from 1 August 2012.

As the facilities within the tubes of Lion Rock Tunnel are suffering from serious deterioration due to aging, as well as broken concrete on road surface which causes bumping when vehicles pass through, the Highways Department decided to undergo renovation works upon the tunnels in 2008. It will extend the lives of the tunnels for around 80 years more.


...