*** Welcome to piglix ***

Line 7, Chengdu Metro

Line 7, Chengdu Metro
 7 
Overview
Type Rapid transit
System Chengdu Metro
Status under construction
Locale Chengdu, China
Termini No Terminals, Loop line only.
Stations 31
Services 1
Operation
Planned opening Late 2017
Owner City of Guangzhou
Operator(s) Chengdu Metro Corporation
Character Underground only
Depot(s) Chuijiadian
Rolling stock Chuanshi
Technical
Line length 38.61 km (23.99 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rail, 1,500 V DC

Line 7 is a route of the Chengdu Metro (Chinese: 成都地铁7号线; pinyin: Chéngdū Dìtiě Qī Hào Xiàn) currently under construction. It will loop between North Railway Station, Chengdu University of Technology, Huaishudian, Chengdu East Railway Station, Sichuan Normal University, Chengdu South Railway Station, Taipinyuan, Jinshan Museum, Southwest Jiaotong University, and City North Coach Terminal Center. The total length will be 38.61 km. Line 7's color is light blue. Construction began on 14 September 2015, and will end in late 2019. It will be an inner circle line.


...
Wikipedia

...