Circular Line / Y / 6 | |
---|---|
Y | |
The same trains planned for the Taipei Metro Yellow Line (manufactured from Ansaldo STS) are in use on the Copenhagen Metro in Denmark
|
|
Overview | |
Type | Light metro |
Locale |
Taipei and New Taipei, Republic of China (Taiwan) |
Stations | 47 |
Operation | |
Opened | June 2018 (planned) |
Operator(s) | Taipei Rapid Transit Corporation |
Character | Elevated and underground |
Depot(s) | North Depot, South Depot |
Rolling stock | AnsaldoBreda Driverless Metro |
Technical | |
Line length | 52.4 km (32.6 mi) |
Number of tracks | 2 |
Track gauge | 6 ft 2 in (1,880 mm) |
Line 6 | |||||||||||||||
Traditional Chinese | 黃線 | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 黄线 | ||||||||||||||
|
Transcriptions | |
---|---|
Standard Mandarin | |
Hanyu Pinyin | Huáng Xiàn |
Wade–Giles | Huang Hsien4 |
Tongyong Pinyin | Huáng-Siàn |
Southern Min | |
Hokkien POJ | Ng-Sòaⁿ |
The Line Y of Taipei Metro (Circular Line or Yellow Line or Line 6) is a line in Taipei and New Taipei, Taiwan, currently under construction with the first section scheduled to open in June 2018. The remaining sections are still under planning.