*** Welcome to piglix ***

Line 15, Beijing Subway

Line 15, Beijing Subway
BJS Line 15 icon.svg
北京地铁15号线列车.JPG
Overview
Type Rapid transit
System Beijing Subway
Status Operational
Termini Qinghuadongluxikou
Fengbo
Stations 18
Daily ridership 149,400 (2014 Avg.)
432,200 (2016 Peak)
Operation
Operator(s) Beijing Mass Transit Railway Operation Corp., Ltd
Character Underground, high elevated
Technical
Line length 41.4 km
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification Third rail
Route map
Lines 13, 15
[{{fullurl:{{{1}}}|action=edit}}    ]
Qinghuadongluxikou
[{{fullurl:{{{1}}}|action=edit}}    ]
Liudaokou
[{{fullurl:{{{1}}}|action=edit}}    ]
Beishatan
Lines 8, 15
[{{fullurl:{{{1}}}|action=edit}}    ]
[{{fullurl:{{{1}}}|action=edit}}    ]
Olympic Green
[{{fullurl:{{{1}}}|action=edit}}    ]
Anlilu
Lines 5, 15
[{{fullurl:{{{1}}}|action=edit}}    ]
[{{fullurl:{{{1}}}|action=edit}}    ]
Datunlu East
[{{fullurl:{{{1}}}|action=edit}}    ]
Guanzhuang
Lines 13, 15
[{{fullurl:{{{1}}}|action=edit}}    ]
[{{fullurl:{{{1}}}|action=edit}}    ]
Wangjing West
Lines 14, 15
[{{fullurl:{{{1}}}|action=edit}}    ]
[{{fullurl:{{{1}}}|action=edit}}    ]
Wangjing
[{{fullurl:{{{1}}}|action=edit}}    ]
Wangjing East
[{{fullurl:{{{1}}}|action=edit}}    ]
Cuigezhuang
[{{fullurl:{{{1}}}|action=edit}}    ]
Maquanying
[{{fullurl:{{{1}}}|action=edit}}    ]
Sunhe
[{{fullurl:{{{1}}}|action=edit}}    ]
China International Exhibition Center
[{{fullurl:{{{1}}}|action=edit}}    ]
Hualikan
[{{fullurl:{{{1}}}|action=edit}}    ]
Houshayu
[{{fullurl:{{{1}}}|action=edit}}    ]
Nanfaxin
[{{fullurl:{{{1}}}|action=edit}}    ]
Shimen
[{{fullurl:{{{1}}}|action=edit}}    ]
Shunyi
[{{fullurl:{{{1}}}|action=edit}}    ]
Fengbo

Line 15 of the Beijing Subway (simplified Chinese: 北京地铁15号线; traditional Chinese: 北京地鐵15號線; pinyin: běijīng dìtiě shíwǔhào xiàn) is a rapid transit rail line in northern Beijing with one portion in operation and the remainder under construction. In all, the line is set to have a total length of 45.7 kilometres (28.4 mi) across northern Beijing from Xiyuan in Haidian District in the west, to Hedong in Shunyi District in the east. The line uses Sparcs CBTC system supplied by Nippon Signal. It is being built in two phases. Phase I covers the eastern half of Line 15 from Qinghuadongluxikou in Haidian District to Fengbo in Shunyi District. It will cost ¥17.6 billion. Section 3 of Phase 1 opened in 2014. Phase II is expected to be completed by 2015. The line features 6-car trains similar to other lines in the Beijing Subway. Line 15 tunnels will be up to 38 metres (125 ft) underground, making them the deepest in Beijing's subway system. Trains run every five minutes during the rush hour, with a journey from Fengbo to Qinghuadongluxikou Station taking 60 minutes.

Phase I is planned to be 38.3 km long (23.8 mi) with 18 stations, covers the eastern half of Line 15 and connects the suburbs of Shunyi District with the existing subway network at Wangjing West (Line 13), Datun Lu East (Line 5) and at the Olympic Green (Line 8). Currently all three sections of Phase I are operational. It has 18 stations and is over 41 km (25 mi) in length. The operational sections run from the Qinghuadongluxikou in Haidian District to Fengbo in Shunyi District. Line 15 travels underground from Qinghuadongluxikou to Maquanying, and then goes above ground on an elevated track to Houshayu before returning underground and going underneath the Chaobai River to Fengbo. The elevated section is high enough to allow elevated roads to pass underneath. A major public venue on the Line 15 route is the New China International Exposition Center (New CIEC) 新国展 at the China International Exhibition Center station 国展站. New CIEC holds the annual Beijing International Automotive Exhibition, which attracted 800,000 visitors in 2012.


...
Wikipedia

...