*** Welcome to piglix ***

Kuala Lumpur International Airport

Kuala Lumpur International Airport
Lapangan Terbang Antarabangsa Kuala Lumpur
Kuala Lumpur International Airport Logo.svg
KLIA MTB&Tower.jpg
Summary
Airport type Public
Owner Government of Malaysia
Operator Malaysia Airports
Serves Greater Klang Valley
Location Sepang, Selangor, Malaysia
Hub for
Time zone MST (UTC+08:00)
Elevation AMSL 70 ft / 21 m
Coordinates 02°44′36″N 101°41′53″E / 2.74333°N 101.69806°E / 2.74333; 101.69806Coordinates: 02°44′36″N 101°41′53″E / 2.74333°N 101.69806°E / 2.74333; 101.69806
Website www.klia.com.my
Map
WMKK is located in Peninsular Malaysia
WMKK
WMKK
Location in Peninsular Malaysia
Runways
Direction Length Surface
m ft
14L/32R 4,124 13,530 Concrete
14R/32L 4,056 13,307 Concrete
15/33 4,056 13,307 Concrete
Statistics (2015)
Passenger 48,938,424 (Steady)
Airfreight (tonnes) 726,230 (Decrease 3.7%)
Aircraft movements 354,519 (Increase 4.0%)
Sources: MAHB and AIP
Passenger 48,938,424 (Steady)
Airfreight (tonnes) 726,230 (Decrease 3.7%)
Aircraft movements 354,519 (Increase 4.0%)
Infrastructure
Passenger terminal buildings
Totals Current
Floor area 737,249 m2 (7,935,680 sq ft)
Handling capacity 70 million passengers per annum
Parking bays 114 (aerobridge)
48 (remote)
Main Terminal Building 1 & Contact Pier
Opened 27 June 1998
Floor area 336,000 m2 (3,620,000 sq ft)
Handling capacity 5 million passengers per annum
Parking bays 20 (aerobridge)
23 (remote)
Satellite Terminal A
Opened 27 June 1998 
Floor area 143,404 m2 (1,543,590 sq ft)
Handling capacity 20 million passengers per annum
Parking bays 26 (aerobridge)
15 (remote)
klia2
Opened 2 May 2014
Floor area 257,845 m2 (2,775,420 sq ft)
Handling capacity 45 million passengers per annum
Parking bays 68 (aerobridge)
10 (remote)
Bunga Raya Complex
Opened 27 June 1998 
Floor area
Handling capacity
Parking bays 1

Kuala Lumpur International Airport (KLIA) (Malay: Lapangan Terbang Antarabangsa Kuala Lumpur) (IATA: KULICAO: WMKK) is Malaysia's main international airport and one of the major airports in South East Asia. Built at a cost of US$3.5 billion in Sepang district of Selangor, it is located approximately 45 kilometres (28 mi) south of Kuala Lumpur city centre and serves the Greater Klang Valley conurbation.

KLIA is the largest and busiest airport in Malaysia. In 2015, it handled 48,938,424 passengers and 726,230 tonnes of cargo. It is the world's 23rd-busiest airport by total passenger traffic.

The airport is operated by Malaysia Airports (MAHB) Sepang Sdn Bhd and is the major hub of Malaysia Airlines, MASkargo, AirAsia, AirAsia X, Malindo Air, UPS Airlines and Gading Sari.

The ground breaking ceremony for Kuala Lumpur International Airport (KLIA) took place on 1 June 1993 when the government under Mahathir Mohamad decided that the existing Kuala Lumpur airport, then known as Subang International Airport (now Sultan Abdul Aziz Shah Airport) could not handle future demand. The construction of the airport was done mainly by a few state owned construction companies as well as Ekovest Berhad – helmed by Tan Sri Datuk Lim Kang Hoo. It was created as part of the Multimedia Super Corridor, a grand development plan for Malaysia. The chief architect who designed the new airport terminal was the Japanese architect Kisho Kurokawa.


...
Wikipedia

...