Jessup Covered Bridge

Jessup Covered Bridge
Bridge
Official name: Jessup Covered Bridge
Named for: Jessup, Indiana
Country  United States
State  Indiana
County Parke
Township Florida
Crosses Little Raccoon Creek
Coordinates 39°39′49.87″N 87°15′23.68″W / 39.6638528°N 87.2565778°W / 39.6638528; -87.2565778Coordinates: 39°39′49.87″N 87°15′23.68″W / 39.6638528°N 87.2565778°W / 39.6638528; -87.2565778 Original Location
Length 175 ft (53 m) 155ft +10ft overhangs on each end
Width 16 ft (5 m)
Clearance 13 ft (4 m)
Builder Jefferson P. Van Fossen
Design Double Burr Arch truss single-span bridge
Material Wood
Built 1910
WGCB Number 14-61-06x
Destruction 1989 Flood
Location of the Jessup Bridge in Indiana
Map of USA IN.svg
Location of Indiana in the United States

The Jessup Covered Bridge was north of Jessup, Indiana. The single-span Burr Arch covered bridge structure was built by the Jefferson P. Van Fossen in 1910 and destroyed by flood in 1989.

Originally the main road to Rockville from Terre Haute was through Coxville, with this bridge it was shorter to go through what was originally Jessup Station. By 1969 though the bridge had been bypassed and closed by a new bridge. However, a December flood in 1969 would give the bridge a new leese on life.

It was decided, after the Adams Covered Bridge was destroyed by flood waters in 1969, that the Jessup Covered bridge could replace it. Elmer Buchta of Buchta Trucking was contracted for the 12-mile move to the Adams Bridge.

After several days of removing the south abutment, the bridge was jacked onto two sets of multi-wheeled dollies. On Tuesday, February 3, 1970, the Jessup Covered Bridge started its road trip to what would be its home for the next 20 years, until it would meet the same fate as it predecessor. The bridge was first pulled to Catlin where it took 3 1/2 hours to get around the two 90-degree turns. That night it was held at Catlin before making its way to Rockville on Wednesday. The trip was slowed down because of three county bridges it had to pass over. The Highway Department had already applied a foot and a half of dirt on the bridge deck to lift the bridge over the concrete rails but additional cribbing was needed to allow the bridge to clear. That night the bridge was parked in front of Ferguson Lumber on S. Market Street on the south side of Rockville. On Thursday the bridge moved uphill to the courthouse square. The traffic lights had already been moved and the bridge made its right-hand turn onto U.S. 36. From there it probably traveled down U.S. 36 to Adams Road, which leads to the Adams Farm and the new location for the bridge.(39°46′52″N 87°8′42″W / 39.78111°N 87.14500°W / 39.78111; -87.14500) Over the weekend, however, disaster struck in the form of warming weather which allowed to ground to thaw, which brought the move to a halt until temperatures dropped on Monday so that by Wednesday the ground had refroze. On Wednesday the bridge was able to be pulled across a big field and jacked into its new location 12 miles upstream from its original location.


...