*** Welcome to piglix ***

Hubli Airport

Hubballi Airport
Summary
Airport type Public
Operator Airports Authority of India
Serves Hubli, Dharwad
Location Hubli, Karnataka, India
Elevation AMSL 2,171 ft / 662 m
Coordinates 15°21′42″N 075°05′05″E / 15.36167°N 75.08472°E / 15.36167; 75.08472Coordinates: 15°21′42″N 075°05′05″E / 15.36167°N 75.08472°E / 15.36167; 75.08472
Website www.aai.aero/allAirports/hubli_generalinfo.jsp
Map
HBX is located in Karnataka
HBX
HBX
HBX is located in India
HBX
HBX
Runways
Direction Length Surface
ft m
08/26 5,479 1,670 Asphalt

Hubballi Airport (IATA: HBXICAO: VAHB) serves the twin cities of Hubli and Dharwad in the state of Karnataka, India. It lies on Gokul Road, 8 kilometres west of Hubli. The airport has flights to Bangalore by Air India Regional as of January 2017.

Hubli Airport is spread over 369 acres and has one runway oriented 08/26, 1,670 metres in length. Its apron measures 13,500 square metres, while its terminal building measures 368 square feet and can handle 150 passengers. The airport has basic air navigation and landing aids like PAPI and a NDB. It also has a helipad. The runway extension work has been completed. The apron is connected to the runway by two perpendicular taxiways.

The Government of Karnataka signed a memorandum of understanding (MoU) with the Airport Authority of India (AAI) in January 2013 to develop Hubli Airport. The AAI will expand it into an all-weather airport at a cost of Rs 1.60 billion. Accordingly, 588 acres (2.38 km2) of land was acquired by the State Government and handed over to the AAI.

The area of the airfield will be increased to 615 acres and the runway will be extended to 7,500 feet. The runway extension work is expected to cost Rs 900 million. A new taxiway, roofing, fire station and a domestic terminal building are also part of the up gradation project that will enable the operation of larger aircraft like the Boeing 737 and the Airbus A320. AAI constructed a new DVOR building and NDB building in 2016 and commenced the work on extension, strengthening & widening of runway, taxiways & isolation bay. A new Terminal Building, ATC tower cum Technical block cum Fire Station, sub-station, new apron and other ancillary buildings and services including perimeter road are under construction. The project is expected to be completed by 2018.


...
Wikipedia

...