Line 5 Eglinton | |||
---|---|---|---|
Promotional logo of the construction project
|
|||
Overview | |||
Type | Light rail | ||
Status | Under construction | ||
Locale | Toronto, Ontario, Canada | ||
Termini |
Mount Dennis Kennedy |
||
Stations | 25 (phase 1), 61 (phase 2) | ||
Operation | |||
Planned opening | 2021 | ||
Owner | Metrolinx | ||
Operator(s) | Toronto Transit Commission | ||
Depot(s) | Black Creek Carhouse | ||
Rolling stock | Flexity Freedom | ||
Technical | |||
Line length | 19 km (12 mi) | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
Electrification | 750 V DC overhead | ||
Operating speed | 80 km/h (50 mph) | ||
|