*** Welcome to piglix ***

Kennedy (TTC)

Kennedy
TTC - Line 2 - Bloor-Danforth line.svg TTC - Line 3 - Scarborough RT line.svg
Kennedy Station Entrance.jpg
Pedestrian entrance on the south service road of Eglinton Avenue
Location 2455 Eglinton Avenue East
Canada
Coordinates 43°43′57″N 79°15′49″W / 43.73250°N 79.26361°W / 43.73250; -79.26361Coordinates: 43°43′57″N 79°15′49″W / 43.73250°N 79.26361°W / 43.73250; -79.26361
Platforms 1 centre platform (on Line 2)
2 side platforms (on Line 3)
Tracks 3 (2 on Line 2 and 1 for Line 3)
Connections GO Transit logo.svg Stouffville line GO logo.png Kennedy GO Station
Construction
Structure type underground (Line 2)
elevated (Line 3)
Platform levels 4
Parking 1,135 spaces
Disabled access Yes
History
Opened 21 November 1980 (1980-11-21) (Line 2)
22 March 1985 (1985-03-22) (Line 3)
Traffic
Passengers (2015) 69,790 (Line 2)
35,790 (Line 3)
105,580 (Total)
Services
Preceding station   TTC   Following station
toward Kipling
TTC - Line 2 - Bloor-Danforth line.svg Bloor–Danforth Terminus
Terminus TTC - Line 3 - Scarborough RT line.svg Scarborough
toward McCowan
toward Mount Dennis
TTC - Line 5.svg Eglinton
Opens 2021
Terminus

Kennedy is both a terminal and interchange station on Line 2 Bloor–Danforth and Line 3 Scarborough of the Toronto subway system. Opened in 1980, it is located east of the Kennedy Road and Eglinton Avenue intersection. With the adjacent Kennedy GO station on the Stouffville line of GO Transit, Kennedy is an intermodal transit hub and the fifth busiest station in the system, after St. George, Bloor-Yonge, Sheppard-Yonge, and Union, serving a total of approximately 105,580 customer trips a day.

The station's main complex consists of four floors with wheelchair accessible entrances. The ground level is the bus terminal surrounded with ten platforms that serve eleven Toronto Transit Commission (TTC) bus routes. Wi-Fi service is available at this station.

The station is to be overhauled and expanded over the next decade as Line 3 will be decommissioned once the extension of Line 2 to Scarborough City Centre has been completed. The future light rail line, Line 5 Eglinton, will terminate at the station when its first phase opens in 2020. The city's proposed commuter rail line is also planned to connect at Kennedy.

The station is located south of Eglinton Avenue, east of Kennedy Road. The station complex consists of four levels. The S-series trains of Line 3 Scarborough ascend via a bridge to the platform located at the top level of the station complex. The ground floor (third floor) consists of ten bus platforms surrounding the main building. Four satellite pedestrian entrances to the station can be found at the South Parking Lot, next to the Don Montgomery Community Centre, at the service road of Eglinton Avenue, and the passenger pick-up and drop-off roundabout on Transway Crescent. Below the ground level is the concourse that spans the length of the station, connecting to all pedestrian entrances. Below the concourse is the platform for subway trains on the Line 2 Bloor–Danforth.


...
Wikipedia

...