Domain
|
||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Commuter rail station | ||||||||||||||
Location |
Swanston Street, Melbourne Victoria Australia |
|||||||||||||
Coordinates | 37°49′59″S 144°58′20″E / 37.8331°S 144.9722°ECoordinates: 37°49′59″S 144°58′20″E / 37.8331°S 144.9722°E | |||||||||||||
Owned by | VicTrack | |||||||||||||
Line(s) | Sunshine–Dandenong | |||||||||||||
Platforms | 2 | |||||||||||||
Tracks | 2 | |||||||||||||
Train operators | Metro Trains | |||||||||||||
Connections | 9 tram routes Bus routes 216, 219 & 220 |
|||||||||||||
Construction | ||||||||||||||
Structure type | Underground | |||||||||||||
Disabled access | Yes | |||||||||||||
Other information | ||||||||||||||
Status | Planned | |||||||||||||
Fare zone | 1 | |||||||||||||
Website | Domain station | |||||||||||||
Electrified | Yes | |||||||||||||
|
Domain railway station is a planned station to be built as part of the Melbourne Metro Rail Project. It will be built below St Kilda Road.
The station will be built using the cut-and-cover method. Construction is scheduled to commence in 2018.
During the construction period the Domain Road tram line and Domain Interchange tram stop will close.