Craven Arms | |
---|---|
Craven Arms railway station, looking north
|
|
Location | |
Place | Craven Arms |
Local authority | Shropshire Council |
Grid reference | SO431830 |
Operations | |
Station code | CRV |
Managed by | Arriva Trains Wales |
Number of platforms | 2 |
DfT category | F1 |
Live arrivals/departures, station information and onward connections from National Rail Enquiries |
|
Annual rail passenger usage* | |
2011/12 | 0.100 million |
– Interchange | 4,756 |
2012/13 | 99,834 |
– Interchange | 3,722 |
2013/14 | 0.101 million |
– Interchange | 3,812 |
2014/15 | 0.117 million |
– Interchange | 5,483 |
2015/16 | 0.109 million |
– Interchange | 3,907 |
History | |
Key dates | Opened 1852 |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Craven Arms from Office of Rail and Road statistics. Methodology may vary year on year. | |
Craven Arms railway station serves the small town of Craven Arms in Shropshire, England. Until 1974 it was known as "Craven Arms and Stokesay", named after the nearby coaching inn (the town having not come into being prior to the arrival of the railways) and the historic settlement of Stokesay to the south. It is situated at the junction of the Welsh Marches Line and the Heart of Wales Line, 20 miles (32 km) south of Shrewsbury. All passenger trains calling at the station are operated by Arriva Trains Wales, who also manage it.
The station has two platforms, connected by a footbridge. Platform 1, on the west side, serves northbound trains to Shrewsbury and beyond as well as trains both to and from Swansea via the Heart of Wales Line. Platform 2, on the town side of the station, serves southbound trains to Hereford and Cardiff.
Between 1865 and 1935, Craven Arms was the junction terminus of the Bishop's Castle Railway. There was also a junction serving the line that went to Wellington via Much Wenlock. Adjacent to the station once stood the now demolished carriage sheds. There continues to be a signal box at Craven Arms, to the north of the station by the level crossing.
The Shrewsbury and Hereford Railway company was the first to serve the town, arriving from the north in 1852 and completing its route through to Hereford the following year. The Knighton Railway constructed the first of the three branches from the main line between 1858 and 1861. The second branch was that of the Bishops Castle Railway which arrived in 1865 via a junction with the main line about 1 km to the north, whilst the route from Much Wenlock was completed by the Wenlock, Craven Arms and Lightmoor Extension railway in 1867 (joining the main line a few miles north of the town at Marsh Farm Junction). The LNWR and Great Western Railway jointly leased the main line in 1862, whilst the modest Knighton branch would eventually be extended right through to Swansea by the LNWR over the course of the next decade. The Bishop's Castle branch, which spent its entire existence in receivership closed in 1935. The Much Wenlock line by contrast would remain little altered throughout its life, although the GWR did take control of it soon after opening; its passenger trains ceased in 1951.