Delhi Metro station | |||||||||||
A seen of Chhatarpur Metro station
|
|||||||||||
Location | Chhatarpur, South West Delhi | ||||||||||
Coordinates | 28°30′24″N 77°10′30″E / 28.506552°N 77.174926°E | ||||||||||
Owned by | Delhi Metro Rail Corporation Ltd. (DMRC) | ||||||||||
Line(s) | Yellow Line | ||||||||||
Platforms |
Platform-1 → HUDA City Centre Platform-2 →Samaypur Badli |
||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 2 | ||||||||||
Parking | Available | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | CHTP | ||||||||||
History | |||||||||||
Opened | August 26, 2010 | ||||||||||
Electrified | 25 kV 50 Hz AC through overhead catenary | ||||||||||
Traffic | |||||||||||
Passengers (2015) | 11,50,275 37106 Month average |
||||||||||
Services | |||||||||||
|
|||||||||||
Location | |||||||||||
South Delhi, India |
Chhatarpur (Hindi: छत्तरपुर) is an elevated station on the Yellow Line of the Delhi Metro. It is located in the Chhatarpur locality of the South West district of Delhi, India. Shree Adya Katyayani Shakti Peeth, popularly known as the Chhatarpur Temple is located near the station.
The station was to be opened in June 2010, along with the other stations of the completely elevated corridor of the Yellow Line from Qutub Minar–HUDA City Centre. However, construction on the station was delayed due to land acquisition issues. To make the station operational before the 2010 Commonwealth Games, the Delhi Metro Rail Corporation adopted a special design to construct the Chhatarpur station, using pre-fabricated structures. The station was finally opened to public on 26 August 2010, being built in a record time of nine months. Chhatarpur is the only station in the Delhi Metro network to be made completely of steel.
Delhi Metro Rail Corporation Ltd. (DMRC) started to acquire land in Chattarpur area to construct the station since September 2006. Two hectare plot was required for constructing the main Metro station, an electrical sub station, parking space and other utilities. After having land acquisition problems in acquiring three plots for construction, DMRC decided to skip the station. But the gap between the two stations (Qutub Minar and Sultanpur) on either side of Chhatarpur would have been 2.7 km which is too long for a MRTS system. As the station was expected to see a ridership of about 11,723 passengers daily by 2011 in Vasant Kunj area and the Chhatarpur temple, DMRC decided to construct the station using a special design costing an additional 30 to 50% expense to construct the station within the time frame. The construction work of the station was delayed as the land for the building of the station was acquired by DMRC in October 2009 after prolonged litigation. The elevated station was constructed using a unique method using special pre-fabricated/structural steel as the conventional construction technique by concrete would have taken at least 18 to 24 months. The steel structures were fabricated in a factory in Gurgaon. The quality of the construction was then checked through Radiography of the joints and Dye-Penetration Tests (DPT). To ensure quality work, the welding activity was not carried at Chhatarpur and the steel structures had to be joined using bolting arrangements.