Brokdorf Nuclear Power Plant | |
---|---|
Brokdorf Nuclear Power Plant
|
|
Country | Germany |
Location | Brokdorf, Steinburg |
Coordinates | 53°51′03″N 9°20′41″E / 53.85083°N 9.34472°ECoordinates: 53°51′03″N 9°20′41″E / 53.85083°N 9.34472°E |
Status | Operational |
Construction began | 1975 |
Commission date | October 14, 1986 |
Owner(s) |
E.ON (80%) Vattenfall Europe (20%) |
Operator(s) | E.ON |
Nuclear power station | |
Reactor type | PWR |
Reactor supplier | Siemens |
Cooling source | Elbe River |
Cooling towers | no |
Power generation | |
Units operational | 1 x 1,440 MW |
Make and model | Siemens |
Nameplate capacity | 1,440 MW |
Capacity factor | 90.8% |
Annual gross output | 11,459 GW·h |
Website www |
Brokdorf Nuclear Power Plant (German: Kernkraftwerk Brokdorf, or KBR) is close to the municipality of Brokdorf in Steinburg, Schleswig-Holstein, Germany. It started in October 1986 by a first-of-its-kind joint venture between PreussenElektra and Hamburgische Elektrizitäts-Werke (HEW). During the construction phase in the 1970s and 1980s there were violent protests against nuclear power at the location.
Vattenfall Europe Nuclear Energy GmbH owns 20% and E.ON 80%.
The plant is a pressurized water reactor with uranium dioxide fuel elements, which are used in degrees of enrichment of 1.9%, 2.5% and 3.5%. It also uses MOX fuel. There are 193 fuel assemblies In the reactor, with a total heavy-metal weight of 103 tons. The power station has a thermal output of 3765 MW, as well as an electrical output of 1440 MW. It belongs to the 3rd PWR generation in Germany. With a net generation of just under 12 billion a kWh, it was the worldwide leader in 2005.
The decommissioning of the plant is now planned for 2021.