Brenner railway

Innsbruck–Bozen–Verona railway
ÖBB 4024-076 nahe dem Bahnhof Matrei, Brennerbahn, 01.11.2016.jpg
A regional train passes KM 91,5 towards Matrei station
on the late afternoon of All Saint's Day 2016.
Overview
Locale Austria and Italy
Line number
  • 302 02 Austria
  • 42 (Brenner–Bozen)
  • 43 (Bozen–Verona)
Technical
Line length 275.4 km (171.1 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius 264 m (866 ft)
Electrification
  • 15 kV 16.7 Hz Austria
  • 3 kV Italy
Operating speed 180km/h (max)
Maximum incline
  • north ramp: 2.5%
  • south ramp: 2.25%
Route number
  • 300 (Salzburg Hbf - Brennero/Brenner)
  • 301 (Jenbach - Telfs-Pfaffenhofen / Steinach in Tirol)
  • 50 (Italy)

The Brenner Railway (German: Brennerbahn; Italian: Ferrovia del Brennero) is a major line connecting the Austrian and Italian railways from Innsbruck to Verona, climbing up the Wipptal (German for “Wipp Valley”), passing over the Brenner Pass, descending down the Eisacktal (German for “Eisack Valley”) to Bolzano/Bozen, then further down the Adige Valley to Roverto/Rofreit, and along the section of the Adige Valley, called in Italian the “Vallagarina”, to Verona. This railway line is part of the Line 1 of Trans-European Transport Networks (TEN-T). It is considered a "fundamental" line by the state railways Ferrovie dello Stato (FS).

The railway line was designed under the Austro-Hungarian Empire in the mid-19th century to ensure rapid and safe transport between Tyrol and northern Italy, especially Lombardy–Venetia. It was thus strategically important not only for economic but also for military reasons, as Austria was strongly committed to maintaining its borders south of the Alps.

The first section to be built was the lower section between Verona and Bolzano/Bozen. The design of this section was approved on 10 July 1853 by the engineer Alois Negrelli, an employee of the Südbahn, known for having built other Alpine railway lines and for developing a project of the Suez Canal. The section was opened in two different parts: on 23 March 1859 between Verona to Trento/Trient and 16 May 1859 from Trento/Trient to Bolzano/Bozen. This construction was handled by the k.k. Nord- und SüdTiroler Staatsbahn (German: "North and South Tyrol State Railways"), but the company was taken over by the new Austrian Southern Railway (German: Südbahn) at the beginning of 1859.


...