Brač Airport Zračna luka Brač |
|||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Summary | |||||||||||
Airport type | Public | ||||||||||
Operator | Brač Airport Ltd. | ||||||||||
Serves | Brač, Croatia | ||||||||||
Location | Bol | ||||||||||
Elevation AMSL | 1,776 ft / 541 m | ||||||||||
Coordinates | 43°17′09″N 016°40′47″E / 43.28583°N 16.67972°E | ||||||||||
Website | airport-brac.hr | ||||||||||
Map | |||||||||||
Location of the airport in Croatia | |||||||||||
Runways | |||||||||||
|
|||||||||||
Croatian Aeronautical Information Publication
|
Brač Airport (IATA: BWK, ICAO: LDSB) is an airport on the Croatian island of Brač, close to the town of Bol, after which it is sometimes also named informally. It is one of three island airports in the country (the other two being Krk – Rijeka Airport and Lošinj – Lošinj Airport) used for commercial passenger flights, mainly charter traffic from Europe during the summer season.
Brač Airport is situated in Veško field, 541 m above sea level. It is only 14 km far from Zlatni Rat (Golden horn), one of the top beaches in Europe, and 30 km from Supetar, the largest town on the island. Due to airport's elevation as well as the vicinity of the highest island's peak, Vidova gora, there is a possibility of fog, low stratus and poor visibility. There is also a possibility of snow, but only for a few days during winter. The most frequent winds are bora (NE) and jugo (SE) and temporary light winds, such as mistral (W) and burin (NE).
Brač Airport is equipped for acceptance and dispatching of a smaller commercial aircraft up to 100 seats during both day light and night. It is open all year long. Charters and scheduled flights typically operate only during the summer season. Public transportation is not organised however a taxi service is available during airport opening hours.
Brač Airport was opened on 22 May 1993, making it Croatia's youngest airport.
In November 2016 work started on lengthening the airport's runway, towards southwest, from 1,440 to 1,760 meters, which will allow it to handle aircraft such as Airbus A319, Bombardier C-Series and Embraer 195. Work was valued at 666,000 euros and was finished in March 2017.