Bhakra Dam

Bhakra Dam
Bhakra Dam Aug 15 2008.JPG
The Bhakra Dam
Bhakra Dam is located in India
Bhakra Dam
Bhakra Dam in Bilaspur, Himachal Pradesh
Official name Bhakra Dam
Location Bilaspur, Himachal Pradesh, India
Coordinates 31°24′39″N 76°26′0″E / 31.41083°N 76.43333°E / 31.41083; 76.43333Coordinates: 31°24′39″N 76°26′0″E / 31.41083°N 76.43333°E / 31.41083; 76.43333
Construction began 1948
Opening date 1963
Construction cost 245.28 crore INR in 1963
Dam and spillways
Type of dam Concrete gravity
Impounds Satluj River
Height 741 ft (226 m)
Length 1,700 ft (520 m)
Width (crest) 30 ft (9.1 m)
Width (base) 625 ft (191 m)
Spillway type Controlled, overflow
Reservoir
Creates Gobindsagar Reservoir
Total capacity 9.340 km3
Surface area 168.35 km2
Power station
Commission date 1960-1968
Turbines 5 x 108 MW, 5 x 157 MW Francis-type
Installed capacity 1325 MW
Bhakra Dam bridge
Characteristics
Total length 1700 feet
Width 30 feet

Bhakra Dam is a concrete gravity dam on the Satluj River in Bilaspur, Himachal Pradesh in northern India. The dam forms the Gobind Sagar reservoir.

The dam, located at a gorge near the (now submerged) upstream Bhakra village in Bilaspur district of Himachal Pradesh of height 226 m. The length of the dam (measured from the road above it) is 518.25 m and the width is 9.1 m. Its reservoir known as "Gobind Sagar" stores up to 9.34 billion cubic metres of water. The 90 km long reservoir created by the Bhakra Dam is spread over an area of 168.35 km2. In terms of quantity of water, it is the third largest reservoir in India, the first being in Madhya Pradesh with capacity of 12.22 billion cu m and second Nagarjunasagar Dam.

Described as "New Temple of Resurgent India" by Jawaharlal Nehru, the first prime minister of India, the dam attracts tourists from all over India. Bhakra dam is 15 km from Nangal city and 20 km from Naina Devi town.

Nangal Dam is another dam downstream of Bhakra Dam. However, sometimes both the dams together are called Bhakra-Nangal Dam though they are two separate dams.

The Bhakra-Nangal multipurpose dams were among the earliest river valley development schemes undertaken by India after independence though the project had been conceived long before India became a free nation. The agreement for this project had been signed by the then Punjab Revenue Minister, Sir Chhotu Ram in November 1944 with Raja of Bilaspur and finalised the project plan on 8 January 1945. Preliminary works commenced in 1946. Construction of the dam started in 1948; Jawaharlal Nehru poured the first bucket of concrete into the foundations of Bhakra on 18 November 1955. and the dam was completed by the end of 1963. Successive stages were completed by the early 1970s.

Initially, the construction of the dam was started by Sir Louis Dane, the Lieutenant Governor of Punjab. But the project got delayed and was restarted soon after independence under the chief architect Rai Bahadur Kunwar Sen Gupta. It was financed entirely by the union government. The Control Board for the project included representatives from union government, and of the governments of Punjab, Patiala and East Punjab States Union, Rajasthan, Bilaspur and Himachal Pradesh. The organisation evolved for the purpose of design and construction was divided into three parts. The Designs Directorate provided the designs and drawings. The Construction and Plant Design Directorate was to look after its execution and installing of the plant, while the Directorate of Inspection and Control ensured that the specifications are accorded to safety requirements were met.


...