*** Welcome to piglix ***

Bellinzona railway station

Bellinzona
BellinzonaBahnhof061020.jpg
The station building.
Location Viale Stazione 36,
6500 Bellinzona,
Canton of Ticino,
Switzerland
Coordinates 46°11′43″N 09°01′46″E / 46.19528°N 9.02944°E / 46.19528; 9.02944Coordinates: 46°11′43″N 09°01′46″E / 46.19528°N 9.02944°E / 46.19528; 9.02944
Elevation 241 m (791 ft) AMSL
Owned by Swiss Federal Railways
Operated by Swiss Federal Railways (SBB-CFF-FFS)
Treni Regionali Ticino Lombardia(TILO)
Eurocity (EC)
Line(s) Gotthard railway
Distance 150.9 km (93.8 mi) from Immensee
Platforms 6
History
Opened December 6, 1874 (1874-12-06)
Electrified May 29, 1921 (1921-05-29)
Services
Preceding station   Swiss rail network   Following station
toward Zürich Hbf
EC
toward Zürich Hbf
SBB-CFF-FFS
toward 
toward Basel SBB
SBB-CFF-FFS
toward 
toward Zürich Hbf
SBB-CFF-FFS
Terminus
toward Basel SBB
SBB-CFF-FFS
Terminus
toward Airolo
TILO
S10
toward Chiasso
Terminus
TILO
S20
toward Locarno
Terminus TILO
S30
Location
Bellinzona railway station
Bellinzona railway station
Bellinzona railway station
Bellinzona railway station (Switzerland)

Bellinzona railway station (Italian: Stazione di Bellinzona) serves the city of Bellinzona, in the Canton of Ticino, Switzerland. It is on the Swiss Federal Railways' Gotthard line. The station is nicknamed Porta del Ticino ("Gate of Ticino") since the opening of the Gotthard Base Tunnel in 2016.

The station was opened in 1874, as part of the opening of the Ticino valley railway, with its Biasca – Bellinzona – LuganoChiasso line, and its Bellinzona – Locarno line. In 1882, upon the opening of the Gotthard Rail Tunnel, and the related commencement of services on the line from Airolo to Biasca, Bellinzona was connected with the north, and with German-speaking Switzerland.

In 2008, the SBB Cargo facility at Bellinzona hit the headlines, when its workers went on strike, after SBB Cargo had prescribed rigorous reduction measures for the site.

With the opening of the Gotthard Base Tunnel in 2016, travel times from Lucerne to Bellinzona fell by 45 minutes.

The station has five through platform tracks, served by a side platform and two island platforms, connected by both a pedestrian subway and a footbridge. There are also transit and overtaking tracks for goods trains.


...
Wikipedia

...