Commission date 1981
Power generation
Units operational 4930
Nameplate capacity 576 MW
Annual output 1.1 TWh

The Altamont Pass Wind Farm is located in the Altamont Pass of the Diablo Range in Northern California. It is one of the earliest wind farms in the United States. The first wind turbines were placed on the Altamont by Fayette Manufacturing Corporation on land owned by cattle rancher Joe Jess. The wind farm is composed of 4930 relatively small wind turbines of various types, making it at one time the largest wind farm in the world in terms of capacity. Altamont Pass is still the largest concentration of wind turbines in the world, with a capacity of 576 megawatts (MW), producing about 125 MW on average and 1.1 terawatt-hours (TWh) yearly. They were installed after the 1970s energy crisis in response to favorable tax policies for investors.

The small turbines used at Altamont are dangerous to various raptors that hunt California Ground Squirrels in the area. 1300 raptors are killed annually, among them 70 golden eagles, which are federally protected; in total, 4700 birds are killed annually. Overall there has been an 80% decline in golden eagles in Northern California, with no golden eagles nesting near the facility, although it is a prime habitat. Considered largely obsolete, these numerous small turbines are being gradually replaced with much larger and more cost-effective units. The larger units turn more slowly and, being elevated higher, are claimed to be less hazardous to the local wildlife. This claim is supported by a report done for the Bonneville Power Administration.

As of 2010, a settlement has been reached between the Audubon Society, Californians for Renewable Energy and NextEra Energy Resources (who operate some 5,000 turbines in the area). Nearly half of the smaller turbines will be replaced by newer, more bird-friendly models. The project was expected to be complete by 2015 and included $2.5 million for raptor habitat restoration.

In 2015, NextEra, which owns some of the 100kw Kenetech/US Windpower older turbines, installed during the 1980s, agreed to remove the machines and replace them with 48 new model wind turbines. A power purchase agreement has been completed to power the Googleplex office complex in nearby Mountain View, California. The process of removing old wind turbines and replacing them with newer machines is called repowering.


...