*** Welcome to piglix ***

2009 Workington floods


During the twenty-four hours before Friday 20 November 2009, rainfall of over 300 mm was recorded in Cumbria. Flooding along the Borrowdale and Derwent Valley meant that some areas were up to 8 feet (2.44 m) deep in water. The surge of water off the fells of the Lake District which flowed into Workington down the River Derwent washed away a road bridge and a footbridge. PC Bill Barker was killed when Northside Bridge collapsed. The cemetery at Camerton, historically the burial ground for the community of Seaton, was badly damaged with many gravestones being damaged or upturned.

Shortly after the town was divided, Network Rail announced the construction of a new railway station, Workington North railway station, to be completed within a week on land owned by the local council, to enable access across the river for residents.

As a result of the floods the central arch of Workington (or Calva Bridge) (built 1840) was left unsound and ready to collapse. As a Grade II listed structure, the bridge was analysed by structural experts after the floods, with the aim of being able to repair and reopen the bridge. Workington Bridge reopened to pedestrians on 11 February 2011, Now the bridge is open to vehicles.

Navvies Bridge, was a former railway bridge, built in 1878 by the Cleator and Workington Junction Railway Company. After the railway line was closed, it was used as a footpath and cycle way, linking the Northside community on the north of the river, to Workington's town centre. Navvies Bridge collapsed in the early hours of 20 November 2009. Work on designing replacement bridge began in May 2011, and the new bridge was officially opened to the public, four months later on 10 September.

New Bridge (built 1904) collapsed on the morning of 20 November 2009: it carried a major road from the Low Cloffocks to the north side of the river. PC Bill Barker was directing traffic away from the bridge when it fell into the river. The bridge had been the subject of a Local Government Board Inquiry in 1903, which raised issues relating to its construction.

Work on a permanent replacement bridge began on 15 August 2011. After completion in October 2012, the bridge was opened by HRH Princess Anne on 22 October 2012.

A road bridge over a disused railway line in the village of Camerton collapsed due to floodwaters on the railway line. The bridge was the only vehicular access to the church yard of St Peter's Church in Camerton. The bridge has not been replaced, instead the gap has been filled in and levelled up.


...
Wikipedia

...