Waste-to-energy or energy-from-waste is the process of generating energy in the form of electricity and/or heat from the primary treatment of waste. WtE is a form of energy recovery. Most WtE processes produce electricity and/or heat directly through combustion, or produce a combustible fuel commodity, such as methane, methanol, ethanol or synthetic fuels.

The first incinerator or "Destructor" was built in Nottingham UK in 1874 by Manlove, Alliott & Co. Ltd. to the design of Albert Fryer.

The first US incinerator was built in 1885 on Governors Island in New York, New York.

The first waste incinerator in Denmark was built in 1903 in Frederiksberg

The first facility in the Czech Republic was built in 1905 in Brno.

Gasification and pyrolysis processes have been known and used for centuries. Examples include pyrolysis and gasification of coal as early as the 18th century.... Development of gasification and pyrolysis technologies for processing [residual solid mixed waste] has only become a focus of attention in recent years stimulated by the search for more efficient energy recovery. (2004)

Incineration, the combustion of organic material such as waste with energy recovery, is the most common WtE implementation. All new WtE plants in OECD countries incinerating waste (residual MSW, commercial, industrial or RDF) must meet strict emission standards, including those on nitrogen oxides (NOx), sulphur dioxide (SO2), heavy metals and dioxins. Hence, modern incineration plants are vastly different from old types, some of which neither recovered energy nor materials. Modern incinerators reduce the volume of the original waste by 95-96 percent, depending upon composition and degree of recovery of materials such as metals from the ash for recycling.


...