Type Motorway
Length 41 km (25 mi)
Opened July 2003
(Completed December 2005)
Route number(s)
  • M7
  • Entire length
North end
 
South end
Major suburbs / towns
Highways in Australia
National HighwayFreeways in Australia
Highways in New South Wales

Westlink M7 - formerly Western Sydney Orbital - is one of Sydney, Australia's urban motorways and a part of the Sydney Orbital Network. It is a tolled motorway that is operated by Transurban and connects three motorways: M5 South Western Motorway at Prestons, M4 Western Motorway at Eastern Creek and M2 Hills Motorway at Baulkham Hills. It opened on 16 December 2005, eight months ahead of schedule.

Western Sydney is the fastest growing part of the Sydney metropolitan area. The Ring Road 5 and State Route 55 - and later State Route 77 - originally meant to bypass Sydney, had instead become primary arteries for the western suburbs.

By the late 1990s and first decade of the 21st century Western Sydney had become the third biggest producer of Australia's GDP, after the Sydney CBD and Melbourne. The growth of industrial and residential areas brought about a massive increase in traffic on its local roads. This led to the planning of the Western Sydney Orbital which, among its original purposes, was to serve the stillborn second international airport at Badgerys Creek.

In January 2001 the federal government made a commitment to progressively contribute A$356 million to the M7 project, with the remaining A$1.5 billion required for the design and construction provided by the private sector. The NSW Minister for Planning authorised the undertaking in February 2002.

The M7 Motorway was privately funded through an innovative construction contract method known as a "deed" to facilitate the expedition of the tendering phase; several deeds were drawn up based on the contractors proposals. The deed was for the full design, construction, operation and maintenance of the motorway including more than 40 kilometres (25 mi) of continuously reinforced concrete (CRCP) and asphalt roads, upgrading of local roads, the longest free-flowing (no toll booths) toll road in the world at the time. More than 90 bridges (of four different types) and the largest shared path network in the southern hemisphere. The design, construct, operate and maintain contract worth at least A$2.0 billion was awarded to WSO (Western Sydney Orbital Pty Ltd) by the Roads & Traffic Authority. The design and construct portion of the contract valued at A$1.8 billion was awarded to a joint venture between ABI Group and Leighton Contractors (ALJV) with design work undertaken by a further joint venture by Maunsell Australia and SMEC (Snowy Mountains Engineering Corporation) with further subcontracting to other designers (Arup) and independent verification by Sinclair Knight Merz (SKM). The motorway was opened to traffic in 2005. WSO (commonly known as Westlink) operate the motorway with maintenance subcontracted to Westlink Services and tolling to ROAM. With its opening, Metroad 7 between Liverpool and Beecroft was transferred from Cumberland Highway to Westlink M7. Westlink M7 was the first Sydney motorway to be marked with an alphanumeric shield rather than the hexagonal Metroad shield.


...