West Coast Highway | |
---|---|
West Coast Highway is labelled in double yellow line
|
|
Route information | |
History: | At-grade road widened in 2000 Viaduct opened in 2006 |
Major junctions | |
West end: | West Coast |
East end: | Tanjong Pagar (AYE) |
Highway system | |
Expressways of Singapore |
West Coast Highway (Chinese: 西海岸大路; Malay: Lebuhraya Pantai Barat) is a major arterial road in Singapore which links Jurong industrial estate and Clementi New Town to the city. It is an at-grade road from its junction with Pandan Loop and West Coast Road to its interchange with Pasir Panjang Road, where it becomes a grade-separated viaduct; the viaduct merges with Keppel Road before its interchange with Ayer Rajah Expressway. The total length of the highway is 11 km. The viaduct is newer than the at-grade section, having been completed in 2006.
Despite what its name may suggest, the speed limit on the highway is less than that of an expressway. The highway also has a traffic light junction at its intersection with Clementi Road, something that expressways do not have. The at-grade section of the highway is a three-lane dual carriageway, and the viaduct is a two-lane dual carriageway with a 1-metre hard shoulder. At a length of 5 km, the viaduct is the longest in Singapore.
The Land Transport Authority started modifying and extending the highway in the late 1990s, in response to the increased amount of traffic using it. Its intersection with Clementi Road was widened in 2000. To allow motorists to bypass intersections at Pasir Panjang Road, LTA's plans also called for the construction of a viaduct that would provide a direct link from the highway to Keppel Road on the outskirts of the city area. The viaduct was built in two phases of 2.4 km each. The first phase, from Keppel Road to Telok Blangah Street 31, started construction in 1998 and was opened to traffic on 27 April 2002.
The contract to build the second phase of the viaduct from Telok Blangah Street 31 to the highway's junction with Pasir Panjang Road, worth S$16.7 million, was awarded to L&M Prestressing in January 2000, and the viaduct was expected to be complete by July 2003. However, work slowed down in late 2002 because L&M encountered financial problems. L&M then promised LTA that the viaduct would be completed in May 2005. LTA agreed to give the company time to complete it, but when work had still not finished by that time, LTA terminated the contract on 1 June 2005 and called for an open tender to find a new contractor to finish the work. On 1 August 2005, LTA awarded the contract to Gammon, which completed the remaining work on schedule in March 2006. The viaduct's completion was commemorated with an opening ceremony and fun walk on 25 March 2006, with the then Minister for Transport Yeo Cheow Tong officiating; it was opened to traffic on 26 March 2006.