Vajont Dam | |
---|---|
Official name | Vajont dam |
Location | Italy |
Coordinates | 46°16′02″N 12°19′44″E / 46.26722°N 12.32889°ECoordinates: 46°16′02″N 12°19′44″E / 46.26722°N 12.32889°E |
Construction began | 1956 |
Operator(s) | SADE - Società Adriatica di Elettricità |
Dam and spillways | |
Height | 262 metres (860 ft) |
Length | 160 metres (520 ft) (chord) |
Width (base) | 27 metres (89 ft) (89 ft) |
Reservoir | |
Creates | Lago del Vajont |
The Vajont Dam (or Vaiont Dam) is a disused dam, completed in 1959 in the valley of the Vajont River under , in the municipality of Erto e Casso, 100 km (60 miles) north of Venice, Italy. One of the tallest dams in the world, it is 262 metres (860 ft) high, 27 metres (89 ft) wide and 22.11 metres (72 ft 6 in) thick at the base and 191 metres (627 ft) wide and 3.4 metres (11 ft 2 in) thick at the top.
The dam was conceived in the 1920s, designed by Carlo Semenza, and eventually built between 1957 and 1960 by Società Adriatica di Elettricità ("SADE", or "EDIS") (English: Adriatic Energy Corporation), the electricity supply and distribution monopoly in northeastern Italy, which was owned by Giuseppe Volpi di Misurata. In 1962 the dam was nationalized and came under the control of ENEL as part of the Italian Ministry for Public Works. It was described as 'the tallest dam in the world', intended to meet the growing demands of industrialization, and as of 2017 is still one of the tallest in the world.
On 9 October 1963, during initial filling, a massive landslide caused a man-made megatsunami in the lake in which 50 million cubic metres of water overtopped the dam in a wave 250 metres (820 ft) high, leading to the complete destruction of several villages and towns, and 1,917 deaths. This event occurred when the company and the Italian government dismissed evidence and concealed reports describing the geological instability of Monte Toc on the southern side of the basin, and other early warning signs reported prior to the disaster. Numerous warnings, signs of danger, and negative appraisals had been disregarded, and the eventual attempt to safely control the landslide into the lake by lowering its level came when the landslide was almost imminent and was too late to prevent it. Although the dam itself remained almost intact, and two thirds of the water was retained behind it, the landslide was much larger than expected and the impact brought massive flooding and destruction to the Piave valley below. Although the wave only contained a third of the dam's contents, it was still ten times higher than calculations had predicted.