USS H-1
|
|
Class overview | |
---|---|
Name: | H class |
Builders: |
|
Operators: | United States Navy |
Preceded by: | G class |
Succeeded by: | K class |
Built: | 1911–1918 |
In commission: | 1913–1922 |
Completed: | 9 |
Lost: | 1 |
Retired: | 8 |
General characteristics | |
Type: | Submarine |
Displacement: |
|
Length: | 150 ft 4 in (45.82 m) |
Beam: | 15 ft 10 in (4.83 m) |
Draft: | 12 ft 5 in (3.78 m) |
Installed power: |
|
Propulsion: |
|
Speed: |
|
Range: |
|
Test depth: | 200 ft (61 m) |
Complement: | 25 officers and men |
Armament: |
|
The United States H-class submarines were Holland 602 type submarines used by the United States Navy.
The first three submarines of the class were laid down in March–April 1911 as Seawolf, Nautilus and Garfish, and were renamed H-1, H-2 and H-3 while still under construction on 17 November 1911, as part of a forcewide submarine redesignation. They were commissioned in December 1913/January 1914.
In 1915 the Imperial Russian Navy had ordered 17 H-class submarines from the Electric Boat Company, to be built in Canada at a temporary shipyard near Barnet, Vancouver, British Columbia to avoid US neutrality concerns, which had derailed the delivery of ten similar submarines to the British. The shipyard was owned by the British Pacific Construction and Engineering Co. Eleven were delivered, and served as the American Holland-class submarines, but the shipment of the final six was held up pending the outcome of the Russian Revolution of 1917, and the boats were stored in knockdown condition at their construction yard. All six were purchased by the United States Navy on 20 May 1918 and assembled at Puget Sound Navy Yard before being commissioned as H-4 to H-9 in late 1918.
H-1 ran aground and was wrecked off the coast of Mexico on 12 March 1920, while the remaining eight submarines were decommissioned in late 1922, and laid up in the Reserve Fleet. Finally struck from the Navy List in 1930, they were sold for scrap in 1931 and 1933.