*** Welcome to piglix ***

USS Decatur (DDG-73)

Decatur entering San Diego Harbor, 9 March 2004.
USS Decatur (DDG-73) in March 2004
History
United States
Name: USS Decatur
Namesake: Stephen Decatur
Ordered: 19 January 1993
Builder: Bath Iron Works, Bath, Maine
Laid down: 11 January 1996
Launched: 8 November 1996
Commissioned: 29 August 1998
Motto: In Pursuit of Peace
Status: in active service
Badge: USS Decatur DDG-73 Crest.png
General characteristics
Class and type: Arleigh Burke-class destroyer
Displacement:
  • Light: approx. 6,752 tons
  • Full: approx. 8,886 tons
Length: 505 ft (154 m)
Beam: 66 ft (20 m)
Draft: 31 ft (9.4 m)
Propulsion: 4 General Electric LM2500-30 gas turbines, two shafts, 100,000 total shaft horsepower (75 MW)
Speed: >30 knots (56 km/h)
Range:
Complement:
Sensors and
processing systems:
Electronic warfare
& decoys:
Armament:
Aircraft carried: 1 SH-60 Sea Hawk helicopter can be embarked

USS Decatur (DDG-73) is an Arleigh Burke-class destroyer in the United States Navy. She is named for the former naval officer Stephen Decatur, Jr. This ship is the 23rd destroyer of its class. USS Decatur was the 13th ship of this class to be built at Bath Iron Works in Bath, Maine, and construction began on 11 January 1996. She was launched on 10 November 1996 and was christened on 8 November 1996. On 29 August 1998 she was commissioned at the Tom McCall Waterfront Park in Portland, Oregon.

Following a combination shakedown and transit cruise to the west coast, during which Decatur visited San Juan, Puerto Rico; Puerto Vallarta, Mexico she was commissioned on 19 June 1998 in Bath, Maine with the ceremony taking place 29 August 1998, at the Tom McCall Waterfront Park in Portland, Oregon. The guided missile destroyer arrived at her new home port of San Diego on 4 September. She spent the remainder of the year conducting acoustic trials and combat system evaluations. Decatur then spent three months in a post-shakedown availability in the Southwest Marine Yard.

In April 1999, the warship conducted a short cruise to the Northwest, visiting Decatur Island, Washington, and Vancouver, British Columbia, before returning to San Diego in early May. After a second visit to Washington in August, Decatur sent a boarding team of Damage Control Experts to assist MV Gardenia Ace—a car carrier—which had suffered a fire in her engine room.

Upon completion of her final missile tests and sea trials, Decatur commenced her first western Pacific deployment on 7 January 2000. After stopping at Pearl Harbor to load Tomahawk land-attack missiles, the guided missile destroyer proceeded to the Yellow Sea for Exercise Sharem 2000—a joint U.S. and South Korean naval exercise—in late January. On 30 January, the warship visited Chinhae, South Korea, and over the next two weeks also stopped at Yokosuka and Nagasaki, Japan. She then sailed south through the Taiwan Strait, made a three-day port visit to Hong Kong, and then commenced a South China Sea exercise with units of the Philippine Navy.


...
Wikipedia

...