Native name
|
Турбоатом |
---|---|
State-owned enterprise | |
Industry | Power engineering |
Founded | 1934 |
Headquarters | Kharkiv, Ukraine |
Profit | 1.7 billion UAH (2014) |
Number of employees
|
4773 (2015) |
Website | turboatom |
Turboatom (Ukrainian: Турбоатом) is one of the strategic state-owned enterprises of Ukraine, determining to a considerable degree energy and national security of the state. The plant is among the top ten turbine construction companies in the world, accounting for the global market of power engineering and making real competition to such industrial giants as General Electric, Siemens, Alstom, JSC "Power machines", Andritz Hidro, Voith.
On 1 May 1932, the first stage of the turbogenerator plant was commissioned. Its design capacity was consistent with production of 1.5 million kW per year of steam turbines. Four workshops were put into service: blade, tool, workshop of different parts and workshop of discs and diaphragms.
Achievements in 1932 included:
By the end of 1932, development of the first design of a turbogenerator with a capacity of 50 MW was completed. In early 1933, three more workshops were commissioned: large machining, winding and assembly. At the end of the year, production of 24 types of blades was mastered and turbines were refurbished for Kashira Power Plant and some other power plants.
The years of The Second World War became a serious test for the plant. The plant suspended production of turbines and began manufacture of defense products, manufactured mortars and repaired tanks. The work at the enterprise was suspended only three days before the beginning of the occupation of Kharkiv on 21 October 1941. Meanwhile, an evacuation process was in full swing. During the evacuation, "Turboatom" was divided into several parts. On 23 August 1943, Kharkiv was freed and rehabilitation of the enterprise began.
A team of turbine constructors restored native plant and manufactured products for the country, and at the same time participated in the restoration of municipal services. In late 1944, the plant already had 374 (out of 700) items of machine tools and other production equipment installed in accordance with the plant rehabilitation project. In a year, 250 machine tools were installed and commissioned. The number of workers and employees of the plant rapidly increased from 876 to 1664 persons in a year.
In 1944 for city of Kharkov were restored and equipped four turbines with total capacity of 68 thousand kW; two turbines with capacity of 22 thousand kilowatt for Kyiv and also erected turbines for Sevastopl, Kaluga and Shterov Power Station total capacity of 28,200 kW.