Traveston Crossing Dam (Proposed) | |
---|---|
Location | 16km South of Gympie, Queensland |
Coordinates | 26°20′07″S 152°42′32″E / 26.3354°S 152.709°ECoordinates: 26°20′07″S 152°42′32″E / 26.3354°S 152.709°E |
Type | reservoir |
Basin countries | Australia |
Water volume | 153,000 km3 (1.24×1011 acre·ft) |
Traveston Crossing Dam was a proposed water project that was initiated by the state government of Queensland, Australia, in 2006 as a result of a prolonged drought which saw South-East Queensland's dam catchment area receive record-low rain. The project was cancelled in November 2009, after being refused approval by federal Environment Minister Peter Garrett.
The dam was proposed to stretch from the Traveston Crossing Bridge near Amamoor, 160 kilometres (99 miles) north of Brisbane, south and affect the areas surrounding Bergins Pocket and Kandanga. The dam would have affected major transport arteries through the area, including the North Coast Railway Line and the Bruce Highway.
The planned damming of the Mary River was not a popular idea with local residents who would have been directly affected by its construction, nor for the wider national and international community concerned about the impact on the many endangered and vulnerable species living in the river. There was strong opposition to the dam from the wider and international community based on environmental concerns related to the endangered Mary River cod, Mary River turtle, giant barred frog, Cascade tree frog, Coxen's fig parrot, the vulnerable Queensland lungfish, tusked frog, honey blue-eye fish, the Richmond birdwing butterfly and the Illidge's ant blue butterfly. There were also fears for the dugong, a globally vulnerable species. It was alleged that reduced fresh water flows to the Great Sandy Strait would have affected the growth of seagrass, the Dugong's primary food source.