Torul Dam | |
---|---|
Location of Torul Dam in Turkey
|
|
Official name | Torul Baraji |
Country | Turkey |
Location | Torul |
Coordinates | 40°38′07″N 39°13′52″E / 40.63528°N 39.23111°ECoordinates: 40°38′07″N 39°13′52″E / 40.63528°N 39.23111°E |
Status | Operational |
Construction began | 1998 |
Opening date | 2007 |
Owner(s) | Turkish State Hydraulic Works |
Dam and spillways | |
Type of dam | Embankment, concrete-face rock-fill |
Impounds | Harşit River |
Height | 152 m (499 ft) |
Length | 320 m (1,050 ft) |
Elevation at crest | 921 m (3,022 ft) |
Dam volume | 4,300,000 m3 (5,624,188 cu yd) |
Reservoir | |
Total capacity | 168,000,000 m3 (136,200 acre·ft) |
Surface area | 3.62 km2 (1 sq mi) |
Power station | |
Name | Torul Hydroelectric Station |
Coordinates | 40°38′39.54″N 39°11′9.11″E / 40.6443167°N 39.1858639°E |
Commission date | 2008 |
Type | Conventional, diversion |
Turbines | 2 x 60.75 MW Francis-type |
Installed capacity | 121.5 MW |
Annual generation | 322.28 GWh |
The Torul Dam is a concrete-face rock-fill dam on the Harşit River located 10 km (6 mi) northwest of Torul in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction on the dam began in 1998 and was completed in 2007. The dam's hydroelectric power plant was commissioned in 2008. Water is diverted through a tunnel and on the river's north side where it reaches the power plant located about 4 km (2 mi) downstream. It has an installed capacity of 121.5 MW.