Tom 'Diver' Derrick Bridge

'Diver' Derrick Bridge
TomDiverDerrickBridgeJuly08.jpg
Coordinates 34°50′18″S 138°30′25″E / 34.838283°S 138.506806°E / -34.838283; 138.506806Coordinates: 34°50′18″S 138°30′25″E / 34.838283°S 138.506806°E / -34.838283; 138.506806
Carries Motor vehicles, pedestrians and bicycles
Crosses Port River
Locale Port Adelaide, Australia
Official name Tom 'Diver' Derrick Bridge
Characteristics
Design Single-leaf Bascule bridge
Total length 57.8 metres (189 ft)
Width 4 lanes
Height 10 metres (32 ft)
History
Opened Pedestrians - 01/08/2008, Road Traffic - 03/08/2008

The Tom 'Diver' Derrick Bridge, commonly referred to as the 'Diver' Derrick Bridge, is an opening single-leaf bascule bridge over the Port River, Port Adelaide. It was opened for traffic on 3 August 2008. The entire bridge project cost approximately $178 million. It is located between Docks 1 and 2 at Port Adelaide and links to Francis Street to the east and Victoria Road to the west. It has been built at the same time as a rail bridge, the Mary MacKillop Bridge (34°50′16″S 138°30′25″E / 34.837887°S 138.506948°E / -34.837887; 138.506948), which is located right next to it.

The bridge was the subject of a successful community campaign, spearheaded by the local Semaphore & Port Adelaide RSL Sub-Branch and the Portside Messenger newspaper, to name it after Port Adelaide World War II hero, Tom 'Diver' Derrick VC, DCM instead of the State Government's unpopular choice of the 'Power Bridge'.

For years, debate raged in Port Adelaide about the need for a third crossing over the Port River, in addition to the existing Birkenhead Bridge and Jervois Bridge. Ideas for the crossing included an under-river tunnel, closed bridge, causeway and opening bridge. In the early 2000s the State Government announced the Port River Expressway project, a highway linking Port Adelaide to Adelaide's northern suburbs. The project included a closed bridge across the Port River. However the Port Adelaide community were concerned a closed bridge would cut-off the Port River and block larger boats from accessing the Port's inner harbour. After a strong community campaign, the State Government agreed to build a high-level single-leaf bascule opening bridge, instead of a closed bridge. AbiGroup was awarded the tender to build the bridge in 2005 and construction began the following year. The twin bascule bridges were designed by the New York City based engineering firm, Hardesty & Hanover, LLP. The bridge was expected to be complete in December 2007, but due to delays it was opened for vehicles on 3 August 2008.


...