*** Welcome to piglix ***

Tiruchirappalli International Airport

Tiruchirappalli International Airport
திருச்சிராப்பள்ளி பன்னாட்டு வானூர்தி நிலையம்
Tiruccirāppaḷḷi Paṉṉāṭṭu Vāṉūrti Nilaiyam
Tiruchirappalli International Airport Front View.jpg
Summary
Airport type Public
Owner Ministry of Civil Aviation
Operator Airports Authority of India
Serves Tiruchirapalli and Central districts of Tamil Nadu
Location Trichy - Karaikudi Highway(NH210) , Tiruchirapalli, Tamil Nadu, India
Elevation AMSL 288 ft / 88 m
Coordinates 10°45′55″N 078°42′35″E / 10.76528°N 78.70972°E / 10.76528; 78.70972Coordinates: 10°45′55″N 078°42′35″E / 10.76528°N 78.70972°E / 10.76528; 78.70972
Website http://aai.aero
Map
TRZ is located in Tamil Nadu
TRZ
TRZ
TRZ is located in India
TRZ
TRZ
Runways
Direction Length Surface
m ft
09/27 2,480 8,136 Asphalt
Statistics (2016)
Passenger movements 1,353,974(Increase6.21%)
Aircraft movements 11,009(Increase7.07%)
Cargo tonnage 6,711 (Increase2.67%)
Source: AAI
Passenger movements 1,353,974(Increase6.21%)
Aircraft movements 11,009(Increase7.07%)
Cargo tonnage 6,711 (Increase2.67%)

Tiruchirappalli International Airport or Trichy International Airport (IATA: TRZICAO: VOTR) is an international airport serving Tiruchirapalli city in the state of Tamil Nadu, India. It is on National Highway 210 connecting Tiruchirapalli with Karaikudi and is 5 km (3.1 mi) south of the city center. The airport is the third largest in the state in passenger and cargo traffic after Chennai International Airport and Coimbatore International Airport. The airport is ISO 9001:2008 quality certified. And was declared an international airport on 4 October 2012 with flights to middle east, south and south east asia

Air Ceylon (Sri Lankan Airlines) began operations in the late 1940s while Indian started services in the 80s. The airlines operated flights from Trichy to Colombo through Jaffna.

This was a Customs Airport until 4 October 2012, when it was given an International Airport status by the Ministry of Civil Aviation. The Indra ATS Automation system was installed at Trichy in April 2012 to help air traffic control increase safety and security.

The airport has two adjacent terminals. The integrated international terminal is used for international and domestic air traffic. The old terminal has been converted into an international cargo complex. The 4,000 m2 (43,000 sq ft) cargo complex was commissioned for operations on 21 November 2011.

The new integrated passenger terminal built at cost of 80 crore (US$12 million) was inaugurated on 21 February 2009 and started operations from 1 June 2009. The two-story terminal has a floor area of 11,777 m2 (126,770 sq ft). The terminal is designed to handle 470 passengers at a time. Some of the features of the new terminal include:


...
Wikipedia

...