Te Rewa Rewa Bridge

Te Rewa Rewa Bridge
View through the steel arch of a bridge, with a mountain in the background
Te Rewa Rewa Bridge with Mount Taranaki in the background
Coordinates 39°02′16″S 174°06′43″E / 39.037778°S 174.111944°E / -39.037778; 174.111944 (Te Rewa Rewa Bridge)
Carries pedestrians, cyclists
Crosses Waiwhakaiho River
Locale New Plymouth, Taranaki, New Zealand
Official name Te Rewa Rewa Bridge
Characteristics
Design steel arch
Material steel, concrete deck
Total length 70 m
Width 2.5 m
Height 10 m at highest point
Longest span 68.8 m
No. of spans 1
Piers in water nil
Clearance below 4.5 m
History
Designer Novare Design Ltd
Constructed by Whitaker Civil Engineering
Construction start 2008
Construction end 2010
Opened 5 June 2010 (2010-06-05)

Te Rewa Rewa Bridge is a pedestrian and cycleway bridge across the Waiwhakaiho River at New Plymouth in New Zealand. Its spectacular shape and setting make it a popular landmark.

The bridge is part of the northern extension to the Coastal Walkway, connecting New Plymouth with Bell Block. The extension was made possible by a special agreement between Ngāti Tawhirikura hapū and the New Plymouth District Council. A historic is located on the north river bank and this was the site of a battle during the Musket Wars; the site is a burial ground (Rewa Rewa). The bridge is located in a semi-rural area.

The bridge was commissioned by New Plymouth District Council and designed and constructed by a consortium of Whitaker Civil Engineering, Novare Design Ltd, Apex Consultants Ltd (now Spiire) and Fitzroy Engineering. The bridge was funded by New Plymouth District Council and the Whitaker family.

The designer, Peter Mulqueen, is quoted as saying he understood that the bridge should "touch lightly" on the Rewa Rewa side of the river, in order to honour the deceased. This ruled out heavier designs like cable stays and angular truss structures. Mulqueen wanted to achieve a bridge with a "harmonious and dignified character".

With the ribs yielding to the prevailing wind, the bridge is aligned to Mount Taranaki. The sacred mountain is framed within the skewed arch when viewed while leaving the sacred ground – promising what is eternal.

The 68.8 metres (226 ft) bridge is designed to accommodate an ambulance and other service vehicles. It is made of three steel tubes; two beneath the deck and the remaining one, together with 19 ribs, forming a distinctive arch. 85 t of fabrication steel, 62 t of reinforcing steel and 550 m3 (19,000 cu ft) of concrete have been used for its construction. The bridge deck has been placed at 4.5 metres (15 ft) above normal flow level to withstand both floods and lahars from volcanic eruptions.


...