Status Operational
Construction began 1979
Commission date 1 Unit: May 1984
2 Unit: May 1985
3 Unit: February 1986
4 Unit: November 1986
Construction cost A$1.23 billion
Owner(s) Stanwell Corporation
Thermal power station
Primary fuel Bituminous coal
Power generation
Units operational 4 × 350 MW
Make and model Hitachi
Nameplate capacity 1,400 MW
Website
www.stanwell.com/tarong-power-station.aspx

The Tarong Power Station is a coal fired power station located on a 1,500 hectares (3,700 acres) site in Tarong in the South Burnett Region near the Burnett River and Nanango, in Queensland, Australia. The station has a maximum generating capacity of 1,400 megawatts, generated from four turbines.

Coal is supplied via a conveyor from Meandu Mine, which is 1.5 kilometres (0.93 mi) away and is also owned by Stanwell.

It was decided to build a new power station at Tarong in 1978, with work beginning in the following year. Initially it was expecting to be operating by October 1985 but this date was brought forward by 17 months to cover the expected growth in demand. 1 Unit was commissioned in May 1984, with 2 Unit following exactly 12 months later. 3 Unit was commissioned in February 1986, and finally 4 Unit was commissioned just 9 months later in November 1986. Thus the accelerated construction program included bringing forward the dates but also compressing the timeline.

The design included Queensland's first hyperbolic natural draught cooling towers which rise to 118 m. The power station has one chimney which is 20 m in diameter and rises 210 m. There are two control rooms. The total construction cost including water supply facilities was A$1,230 million.

The power station is the site for a pilot project which is expected to reduce emissions by 1,000 tonnes per year by collected carbon dioxide from flue gases. The project will cost A$5 million and is being developed by CSIRO.

A second trial to capture greenhouse gas emissions is being conducted by MBD Energy. The technology being trialled collects carbon dioxide and pumps it into waste water where it synthesises oil-rich algae into edible seaweed products or oils.

In October 2012, Stanwell announced plans to shut down two generating units for two years. The electricity market was oversupplied and wholesale electricity prices were relatively low. The scaling down of operations resulted in the loss of employment for some workers.


...