Taichung Line (Mountain Line) | |
---|---|
Overview | |
Native name | 臺中線 (山線) |
Type | Heavy rail |
Termini |
Zhunan Changhua, Zhuifen (branch) |
Stations | 17 (16 on main, 1 on branch) |
Operation | |
Opened | 20 February 1908 |
Owner | Taiwan Railways Administration |
Operator(s) | Taiwan Railways Administration |
Technical | |
Line length | 85.5 km (53.1 mi) |
Number of tracks | 2 |
Track gauge | 3 ft 6 in (1,067 mm) |
Electrification | 25 kV/60 Hz Catenary |
Operating speed | 150 km/h (93 mph) |
The Taichung Line (Chinese: 臺中線 or 台中線; pinyin: Táizhōng Xiàn), also known as the Mountain Line (Chinese: 山線; pinyin: Shān Xiàn), is a line of the Taiwan Railway Administration. It is It has a total length of 85.5 km, of which all but 2.2 km (the Chengzhui Line from Chenggong to Zhuifen) is double track.
The Taichung Line was completed in 1908. After the Coast Line between Zhunan and Changhua was finished in 1922, the original line was called Taichung Line. In 1998, the construction to expand to two tracks (double tracks) was completed. Long tunnels were built to reduce the grade of the line. Sanyi Tunnel is one of the longest railway tunnels in Taiwan. The opening of the new segment of the line relegated the previous segment of the line to become the Old Mountain Line.
Currently, the Railway Reconstruction Bureau is transforming the section of the line from Fengyuan to Daqing into an elevated line. Slated for completion in 2017, the project will replace Fengyuan, Tanzi, Taiyuan, Taichung, and Daqing Stations with new, elevated stations, and create the new stations Fengnan, Toujiacuo, Songzhu, Jingwu, and Wuquan.
Distances shown are from Keelung via West Coast Line.
Notes: