*** Welcome to piglix ***

St Bedes Inter-Church comprehensive school

St Bede's Inter-Church School
Motto "Cum Deo" (Latin for "With God")
Established 1962, 1988
Type Academy
Religion Church of England/Roman Catholic
President Geoffrey Cook
Headteacher Alistair Day
Deputy Headteacher Matthew Chancellor
Location Birdwood Road
Cambridge
Cambridgeshire
CB1 3TD
England
Coordinates: 52°11′26″N 0°09′45″E / 52.19051°N 0.16245°E / 52.19051; 0.16245
Local authority Cambridgeshire
Staff 50
Students 750
Gender Coeducational
Ages 11–16
Website www.st-bedes.org.uk

St Bedes Inter-Church School (formerly St Bedes Inter-Church Comprehensive School) is the only Christian state secondary school in Cambridgeshire. It is an academy school with support from both the Roman Catholic Diocese of East Anglia and Anglican Diocese of Ely. The school currently has around 750 pupils and around 50 staff.

St Bede's opened in 1962 as a small Roman Catholic secondary school housed in one central building, under the leadership of headmaster K.G. Kent and around 18 nuns teaching and running the school. Over the years, the school began to admit students from other Christian denominations, notably the Anglican Church. In the light of the increasing ecumenical co-operation between the Roman Catholic and Anglican churches the school was closed, re-opening in 1988 as a joint Catholic/Anglican foundation, St Bedes Inter-Church Comprehensive School, retaining most of the original staff, including the nuns, but with a new management. Gradually, the nuns disappeared, the last two leaving the school in 2001.

Since then the school has expanded and additional buildings have been added; first a technology block, housing Food Technology, Textiles Technology and Design Technology, although now also hosts Information Technology; then the St Etheldreda block, a suite of 12 general-purpose classrooms (the "B Block") in 1995. Three science laboratories were refurbished in 2001; in 2003, four new English classrooms, a purpose built drama and dance studio and purpose built music rooms were added and in 2005 a state of the art Sports Hall including teaching rooms and tennis courts brought the school to its present state. Due to the increasing popularity and expansion of the school the site continued to need mobile classrooms to cope with the demand for teaching space. The latest £4m development began in August 2008, aiming to replace all mobile classrooms with six teaching rooms, two new art rooms and a digital media centre, a chaplaincy and more refurbished science labs. These include the latest developments such as geothermal heating and wireless internet access. The new Art and Chaplaincy building has been connected to the technology and English/music/drama building to create one large building which can be walked through when raining; covered walkways will be added between the main block and "B" block, the only building which now stands alone.


...
Wikipedia

...