![]() Numbers 91-003 and 91-009 on the limestone train from Loerie PPC to New Brighton
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type and origin | |
---|---|
Power type | Diesel-electric |
Designer | General Electric |
Builder | General Electric |
Serial number | 38603-38622 |
Model | GE UM6B |
Build date | 1973 |
Total produced | 20 |
Specifications | |
---|---|
AAR wheel arr. | B-B |
UIC class | Bo'Bo' |
Imperial class | Bo-Bo |
Gauge | 2 ft (610 mm) narrow |
Wheel diameter | 838 mm (33.0 in) 915 mm (36.0 in) Bigfoot |
Wheelbase | 7,290 mm (23 ft 11.0 in) 7,314 mm (24 ft 0 in) Bigfoot |
• Bogie | 2,108 mm (6 ft 11.0 in) 2,082 mm (6 ft 10.0 in) Bigfoot |
Pivot centres | 5,232 mm (17 ft 2.0 in) |
Length: |
|
• Over couplers | 10,580 mm (34 ft 8.5 in) |
Width | 2,564 mm (8 ft 4.9 in) |
Height | 3,632 mm (11 ft 11.0 in) |
Axle load | 12,000 kg (26,000 lb) |
Adhesive weight | 48,000 kg (106,000 lb) |
Loco weight | 48,000 kg (106,000 lb) max |
Fuel type | Diesel |
Fuel capacity | 1,600 litres (350 imp gal) |
Prime mover | Caterpillar D-379 |
RPM range | 650-1,365 |
• RPM idle | 650 |
• Maximum RPM | 1,365 |
Engine type | 4-stroke diesel |
Aspiration | Schwitzer 4ME 455 turbocharger |
Generator | 6 pole GE 5GT-601C1 |
Traction motors | Four GE 5GE-778AI DC 4 pole Two GE 5GE-761-A13 DC 4 pole Bigfoot |
• Rating 1 hour | 410A, 665A Bigfoot |
• Continuous | 395A @ 14 km/h (8.7 mph) 655A @ 15 km/h (9.3 mph) Bigfoot |
Cylinders | V8 |
Gear ratio | 13:68:1 double reduction |
MU working | 3 maximum |
Loco brake | 28-LV-1 with vigilance control |
Train brakes | Westinghouse 4CD2UC compressor/exhauster |
Air reservoir cap | 500 litres (110 imp gal) |
Compressor cap | 0.036 m3/s (1.3 cu ft/s) |
Exhauster cap | 0.072 m3/s (2.5 cu ft/s) |
Couplers |
Willison AAR knuckle (Bigfoot) |
Performance figures | |
---|---|
Maximum speed | 50 km/h (31 mph) |
Power output: |
|
• Starting | 520 kW (700 hp) |
• Continuous | 480 kW (640 hp) |
Tractive effort: |
|
• Starting | 108 kN (24,000 lbf) @ 25% adh. |
• Continuous | 86 kN (19,000 lbf) @ 15 km/h (9.3 mph) |
Factor of adh.: • Starting |
25% |
• Continuous | 20% |
Loco brakeforce | 60% ratio @ 345 kPa (50.0 psi) |
Dynamic brake peak effort | 85 kN (19,000 lbf) @ 14 km/h (8.7 mph) |
Career | |
---|---|
Operators | South African Railways Spoornet Transnet Freight Rail RRL Grindrod |
Class | Class 91-000 |
Number in class | 20 |
Numbers | 91-001 to 91-020 |
Delivered | 1973 |
First run | 1973 |
The South African Railways Class 91-000 of 1973 is a narrow gauge diesel-electric locomotive.
Between September and December 1973, the South African Railways placed twenty Class 91-000 General Electric type UM6B diesel-electric locomotives in service on its narrow gauge Avontuur Railway line, between Port Elizabeth in the Eastern Cape and Avontuur in the Western Cape. Some of them later also worked on the Alfred County Railway line, out of Port Shepstone in KwaZulu-Natal.
The Class 91-000 GE type UM6B diesel-electric locomotive was designed and built for the South African Railways (SAR) by General Electric (GE) in Erie, Pennsylvania. Twenty locomotives were delivered between September and December 1973, numbered in the range from 91-001 to 91-020. It was designed for 2 ft (610 mm) narrow gauge and is the largest two foot gauge diesel-electric locomotive in the world, at an average weight of 44,000 kilograms (97,000 pounds).
The usual practice was to have locomotive builder’s works plates attached to the locomotive’s frame below the cab windows. The Class 91-000 locomotives, however, had their works plates mounted on each side of the long hood. With the exception of numbers 91-001 (GE 38604), 91-002 (GE 38603), 91-016 (GE 38619) and 91-017 (GE 38618), the Class 91-000 works numbers are in sequence with their running numbers. It is very likely, however, that this was the result of body panels being swapped between locomotives during overhauls.
As a result of the severe clearance problems presented by the two foot gauge, it was not possible to follow the usual practice of axle-hung traction motors. Special bogies had to be designed, with the traction motors mounted between the axles, with one traction motor on each side of each bogie.