*** Welcome to piglix ***

Sittingbourne and Kemsley Light Railway

Sittingbourne & Kemsley Light Railway
SKLR Triumph1.JPG
Triumph arriving at Sittingbourne with a rake of cream and maroon narrow-gauge passenger coaches
Locale England
Terminus Sittingbourne
Commercial operations
Name Bowaters Paper Railway
Built by Edward Lloyd Ltd.
Original gauge 2 ft 6 in (762 mm)
Preserved operations
Operated by Locomotive Club of Great Britain (1969-72)
Sittingbourne & Kemsley Light Railway (1972 onwards)
Stations 3
Length 2 miles (3.2 km)
Preserved gauge 2 ft 6 in (762 mm)
Commercial history
Opened 1908
Closed 1969
Preservation history
1970 Opening of Sittingbourne & Kemsley Light Railway
2008 Forced closure to the public
2010 Partial reopening to the public for 40th anniversary
2011 Partial reopening to the public for summer season
2012 Full reopening to the public

The Sittingbourne & Kemsley Light Railway in Kent is a 2 ft 6 in (762 mm) narrow gauge heritage railway that operates from Sittingbourne to the banks of The Swale.

The line was developed as an industrial railway by paper maker Frank Lloyd in 1904, to transport pulp materials and finished products between Ridham Dock, on the River Swale, and the company's paper mill at Sittingbourne, and from the mid-1920s to a second mill at Kemsley.

In the late 1960s the railway faced closure by its then owners Bowater, but the Locomotive Club of Great Britain accepted an offer to operate the railway from 1970. The section of line from Kemsley Down to Ridham Dock was however abandoned for redevelopment of the paper mills.

In 2008-09, the line survived a threat of closure due to the owners of Sittingbourne Paper Mill closing the mill and selling the land, the lease then held by the railway expired in January 2009. Negotiations resulted in the railway being saved, although no public trains ran in 2009.

In September 2010, press reports announced the possibility that the railway would operate an anniversary service - over a short section between Kemsley Down Station and the Milton Regis Halt - to celebrate 40 years of operation. The service carried more than 700 passengers over several days during October.

In 2011, the railway reopened in late May and operated until the end of September. During this time, Milton Regis Viaduct's deferred maintenance, from Winter 2008, was carried out and Essential Land's contractors completed the removal of pipelines around Sittingbourne Viaduct station. The very last train of the Season ran over Milton Regis Viaduct to the gate at Sittingbourne Viaduct station - the first public train to cross the Viaduct since 26 December 2008.

2012 saw the railway return to Sittingbourne Viaduct when it reopened on Sunday 27 May. see "Reopening" section below.


...
Wikipedia

...