*** Welcome to piglix ***

Siemens (train)

Siemens Nexas
Siemens train in Metro Trains Melbourne Livery.jpg
Siemens Nexas at Flinders Street Station in Metro livery in December 2009
SiemensInterior.JPG
Siemens Nexas interior with recovered seats in May 2009
Manufacturer Siemens Transportation Systems
Built at Siemens SGP Verkehrstechnik GmbH, Vienna, Austria
Family name Siemens Modular Metro
Replaced Hitachi trains
Constructed 2002–2005
Number built 72 sets (216 carriages)
Number in service 72 sets (216 carriages)
Formation 3-car sets (driving motor, trailer, driving motor)
Fleet numbers 701M–844M (driving motors)
2501T–2572T (trailers)
Capacity 264 seated (3-carriage set)
Operator(s) Metro Trains Melbourne
Line(s) served Craigieburn, Cranbourne, Frankston, Pakenham, Sandringham, Sunbury, Upfield, Werribee, Williamstown.
Specifications
Car body construction Stainless steel single deck
Car length 24.1 m (79 ft 1 in) (driving motors)
23.8 m (78 ft 1 in) (trailers)
Width 2.95 m (9 ft 8 in)
Floor height 1.23 m (4 ft 0.4 in)
Entry 4 x twin-leaf plug doors per car, 2 either side
Articulated sections 2 per 3-car set, enclosed gangway
Maximum speed Maximum speed of 148 km/h (92 mph)
Operating speed of 130 km/h (81 mph)
Weight 41.5 t (40.8 long tons; 45.7 short tons) (driving motors, tare)
37.8 t (37.2 long tons; 41.7 short tons) (trailers, tare)
Acceleration 1.2 m/s2 (3.9 ft/s2) (limited to 1 m/s2 (3.3 ft/s2)
Electric system(s) 1.5 kV DC Overhead lines
Coupling system Scharfenberg coupler
Track gauge 1,600 mm (5 ft 3 in)

The Siemens Nexas are a class of electric multiple units manufactured by Siemens Transportation Systems for the suburban railway network of Melbourne, Australia between 2002 and 2005. The design of the trains was based on the Siemens Modular Metro.

In March 2000 M>Train ordered 62 Siemens Nexas trains to fulfill a franchise commitment to replace its fleet of Hitachi trains.

The original order was for 62 3-car sets, with an option for an additional ten 3-car sets. In December 2002 just before the first was delivered, National Express handed the M>Train franchise back to the Government of Victoria, thus the first Siemens Nexas' were delivered to the government. All passed to Connex Melbourne in April 2004. The option for ten additional trains was exercised in August 2005, with the last of these delivered in January 2006.

Siemens Rail Services was contracted to provide maintenance of the trains for a period of 15 years (subject to refranchising) at Newport Workshops. With the refranchising of the network to Metro Trains Melbourne in 2009, this maintenance arrangement was retained for an initial three-year period.

The first entered service on 21 March 2003 with the last delivered in January 2006.

In December 2014, Siemens Nexas 831M-2566T -832M with a reduced seating layout added extra hand rails layout at the doors.

In late 2006 the trains suffered a number of braking discrepancies while in service; 14 trains overshot platforms in the space of three days. The 15 units involved in these overshoots were withdrawn from service for checks, and instructions were issued to the drivers to minimise further occurrences. By mid-January 2007, a total of 24 three-carriage trains had been impounded for testing after 20 further incidents of over-running stations since 22 December 2006.

On 13 January 2007, Connex stopped running the Siemens Nexas trains as 3-car sets until the braking issue was resolved, with the result that all services (including evenings and weekends) were operated by 6-car trains. On 29 January 2007, Connex cancelled 37 peak-period services until further notice, due to the shortage of operational trains.


...
Wikipedia

...