Seyrantepe Dam

Seyrantepe Dam
SeyrantepeDam-July2012-01.JPG
Aerial photo of the dam and its power station
Seyrantepe Dam is located in Turkey
Seyrantepe Dam
Location of Seyrantepe Dam in Turkey
Country Turkey
Location Karakoçan on the border of Elazığ and Tunceli Province
Coordinates 39°1′15.68″N 39°53′29.87″E / 39.0210222°N 39.8916306°E / 39.0210222; 39.8916306Coordinates: 39°1′15.68″N 39°53′29.87″E / 39.0210222°N 39.8916306°E / 39.0210222; 39.8916306
Purpose Power, regulation
Status Operational
Construction began 2003
Opening date 2008; 9 years ago (2008)
Dam and spillways
Type of dam Embankment, sand and gravel-fill
Impounds Peri River
Height (foundation) 48.5 m (159 ft)
Height (thalweg) 36 m (118 ft)
Power station
Operator(s) Limak Energy and Bilgin Energy
Commission date September 2008
Type Conventional
Hydraulic head 36 m (118 ft) (gross)
Turbines 2 x 29.39 MW Francis-type
Installed capacity 58.78 MW
Annual generation 180 GWh

The Seyrantepe Dam is an earth-fill embankment dam on the Peri River (a tributary of the Euphrates), located 15 km (9 mi) northwest of Karakoçan on the border of Elazığ and Tunceli Provinces, Turkey. Its primary purpose is hydroelectric power generation and is the fifth dam in the Peri River cascade. Construction on the dam began in 2003 and its power station was commissioned in 2008. It contains two 29.39 MW Francis turbine-generators for a total installed capacity of 58.78 MW. It is owned and operated by Limak Energy and Bilgin Energy. The sand and gravel-fill dam is 48.5 m (159 ft) tall.

At the opening of the hydro plant, President (then-Prime Minister) Recep Tayyip Erdoğan used the opportunity to attack environmentalist critics, a campaign he sustained in office: he said

Speech during the opening ceremony of the Seyrantepe Hydroelectricity Plant, Peri Suyu



...