*** Welcome to piglix ***

Santa Genoveva Airport

Santa Genoveva/Goiânia Airport
Aeroporto Santa Genoveva/Goiânia
Imageropotyo.jpg
Summary
Airport type Public
Operator Infraero
Serves Goiânia
Elevation AMSL 747 m / 2,450 ft
Coordinates 16°37′47″S 049°13′36″W / 16.62972°S 49.22667°W / -16.62972; -49.22667Coordinates: 16°37′47″S 049°13′36″W / 16.62972°S 49.22667°W / -16.62972; -49.22667
Website Infraero GYN
Map
GYN is located in Brazil
GYN
GYN
Location in Brazil
Runways
Direction Length Surface
m ft
14/32 2,500 8,202 Asphalt
Statistics (2015)
Passengers 3,312,290
Aircraft Operations 65,019
Metric tonnes of cargo 6,736
Statistics: Infraero
Sources: Airport Website,ANAC
Passengers 3,312,290
Aircraft Operations 65,019
Metric tonnes of cargo 6,736

Santa Genoveva/Goiânia Airport (IATA: GYNICAO: SBGO) is the airport serving Goiânia, Brazil.

It is operated by Infraero.

The airport was inaugurated in 1955 although operations started a few years earlier. Since 1974 it is operated by Infraero.

The old passenger terminal was capable of handling 600,000 passengers/year but in the last few years it has been operating beyond its capacity: in 2015 it handled more than 5 times its capacity. On May 9, 2016, a new passenger terminal located on the opposite side of the old and across the runway was opened. It is capable of handling 6,3 million passengers/year.

The government of the state of Goiás, in order to encourage tourism and aviation reduced the tax on petrol from 15% to 3%. After such a reduction there was some interest from airlines to build a hub at Santa Genoveva airport but its present operational limitations prevented the immediate implementation of such a plan.

The airport is located 8 km (5 mi) from downtown Goiânia.

Due the increasing amount of traffic that the airport has been receiving in the last years, Infraero has decided to build a new passenger terminal, with 27,160 square meters and capacity for handling 2,1 passengers/year in its initial phase. Possibility for enlargements has already been considered in the original project.

The new terminal will have 32 check-in counters and 8 jetways, apart from usual amenities such as stores and restaurants.

The first phase of the works are due to be concluded in 2012 and the second phase in 2014.


...