Salerno–Reggio Calabria railway
Battipaglia–Reggio di Calabria railway |
Overview |
Type |
Heavy rail |
Status |
in use |
Locale |
Italy |
Termini |
Battipaglia Reggio di Calabria
|
Operation |
Opened |
1895 (1895)
|
Owner |
RFI |
Operator(s) |
Trenitalia |
Technical |
Line length |
374 km (232 mi) |
Number of tracks |
2 |
Track gauge |
1,435 mm (4 ft 8 1⁄2 in) |
Electrification |
3 kV DC |
Route map |
|
|
from Naples |
|
0.000 |
Battipaglia |
|
|
to Potenza |
|
5.719 |
P.M. San Nicola Varco di Eboli |
|
17.679 |
Capaccio-Roccadaspide |
|
21.322 |
Paestum |
|
29.686 |
Agropoli-Castellabate |
|
35.316 |
P.M. Torchiara |
|
|
|
|
|
Rutino (4320 / 4410 m) |
|
|
|
|
41.368 |
P.M. Rutino |
|
|
|
|
|
Lustra (1022 / 1002 m) |
|
|
|
|
46.775 |
Omignano Salento |
|
50.069 |
Vallo della Lucania-Castelnuovo |
|
58.684 |
Velia Scavisince 1936
|
|
60.697 |
Ascea |
|
|
|
|
|
Telegrafo (1017 / 1000 m) |
|
|
Fiumicello (1047 / 3273 m) |
|
|
Acquabianca Pari (1203 m) |
|
|
|
|
|
San Macario (1088 m) |
|
|
Pisciotta (1110 m) |
|
69.419 |
Pisciotta-Palinuro |
|
|
Caprioli (2579 m) |
|
74.558 |
P.M. San Mauro la Bruca |
|
|
|
|
|
Spina (3294 / 3278 m) |
|
|
|
|
78.808 |
Centola |
|
83.344 |
Celle di Bulgheria-Roccagloriosa |
|
90.942 |
Torre Orsaia |
|
96.041 |
Policastro Bussentino |
|
104.789 |
Sapri |
|
|
|
|
|
Acquafredda 1a (3896 / 3900 m) |
|
|
|
|
111.092 |
Acquafredda |
|
|
|
|
|
Arma (2129 / 2128 m) |
|
|
|
|
117.104 |
Maratea |
| | |