*** Welcome to piglix ***

STS-51-D

STS-51-D
STS-51-D Syncom IV-3 activation effort.jpg
Discovery attempts to activate the Syncom IV-3 satellite via a "flyswatter" device attached to the RMS
Mission type Satellite deployment
Operator NASA
COSPAR ID 1985-028A
SATCAT № 15641
Mission duration 6 days, 23 hours, 55 minutes, 23 seconds
Distance travelled 4,650,658 kilometres (2,889,785 mi)
Orbits completed 110
Spacecraft properties
Spacecraft Space Shuttle Discovery
Launch mass 113,802 kilograms (250,891 lb)
Landing mass 89,818 kilograms (198,014 lb)
Payload mass 13,039 kilograms (28,747 lb)
Crew
Crew size 7
Members Karol J. Bobko
Donald E. Williams
M. Rhea Seddon
S. David Griggs
Jeffrey A. Hoffman
Charles D. Walker
Edwin J. Garn
EVAs 1
EVA duration 3 hours, 6 minutes
Start of mission
Launch date April 12, 1985, 13:59:05 (1985-04-12UTC13:59:05Z) UTC
Launch site Kennedy LC-39A
End of mission
Landing date April 19, 1985, 13:54:28 (1985-04-19UTC13:54:29Z) UTC
Landing site Kennedy SLF Runway 33
Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee 300 kilometres (160 nmi)
Apogee 452 kilometres (244 nmi)
Inclination 28.5 degrees
Period 94.4 minutes
Epoch April 14, 1985

Sts-51-d-patch.png STS-51-D Crew.GIF
Back row L-R: Griggs, Walker, Garn
Front row: L-R: Bobko, Williams, Seddon, Hoffman.


Space Shuttle program
← STS-51-C STS-51-B

Sts-51-d-patch.png STS-51-D Crew.GIF
Back row L-R: Griggs, Walker, Garn
Front row: L-R: Bobko, Williams, Seddon, Hoffman.

STS-51-D was the sixteenth flight of NASA's Space Shuttle program, and the fourth flight of Space Shuttle Discovery. The launch of STS-51-D from Kennedy Space Center (KSC), Florida, on April 12, 1985 was delayed by 55 minutes, after a boat strayed into the restricted Solid Rocket Booster (SRB) recovery zone. STS-51-D was the third shuttle mission to be extended.

On April 19, after a week-long flight, Discovery conducted the fifth shuttle landing at KSC. The shuttle suffered extensive brake damage and a ruptured tire during landing. This forced all subsequent shuttle landings to be done at Edwards Air Force Base, California, until the development and implementation of nose wheel steering made landings at KSC more feasible.

During STS-51-D, the shuttle crew deployed two communications satellites: Telesat-I (Anik C1) and Syncom IV-3 (also known as Leasat-3). Telesat-I was attached to a Payload Assist Module (PAM-D) motor and successfully deployed. Syncom IV-3, however, failed to initiate antenna deployment and spin-up, or ignite its perigee kick motor upon deployment. The mission was consequently extended by two days to ensure that the satellite's spacecraft sequencer start lever was in its proper position. Griggs and Hoffman performed an unscheduled EVA to attach homemade "Flyswatter" devices to the shuttle's Remote Manipulator System (RMS). Seddon then engaged the satellite's start lever using the RMS, but again the post-deployment sequence did not begin.


...
Wikipedia

...